2024:Drive Base: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 29: Line 29:
*Fabricate the bed pan- this will house all of the electrical panels and other items to small for the C-Channel
*Fabricate the bed pan- this will house all of the electrical panels and other items to small for the C-Channel
*Build a moveable plate for the hang- this plate will be most likely be 
*Build a moveable plate for the hang- this plate will be most likely be 
1/20/24
<span style="text-decoration: underline;" >'''1/20/24'''</span>


participated in integration and gave our ideas.
participated in integration and gave our ideas.

Revision as of 17:33, 20 January 2024

Drive base status


1/18/24:

We have a drive base!!

Img1705686588494.jpeg

Information:

x4 Mk.4 swerve modules (Neo motors)

x4 25in. side bars

  • x2 bars for the outside of the frame
  • x2 as support/additional mounting bars in located in the middle of the drive base, the bars also serve as protection for the swerve modules preventing damage to our brand new motors
  • From outside bar to outside bar it is a 6.5in offset 
  • The offset on the inside is 12in. from inside bar to inside bar

x2 27in. horizontal bars, act as end caps'

x8 Andymark Corner Brackets (picture)

Img1705659284533.png


-


We still need to finish and mount the following:

  • Fabricate the bed pan- this will house all of the electrical panels and other items to small for the C-Channel
  • Build a moveable plate for the hang- this plate will be most likely be 

1/20/24

participated in integration and gave our ideas.

Crated shop drawings 

looked into bumper screws