2010:Electrical Main: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 3: Line 3:
Things To Do (in no particular order):  
Things To Do (in no particular order):  


#Update Bill of Material.  
...
#<strike>Remove cable assemblies from batteries. *All 2009 batteries have been disassembled. The connectors and pig-tails are separate. Pigtails weigh .94 lbs.* Reassemble at competitions</strike>
 
<font color="#00ff00" size="5">Batteries are allowed into competition fully put together thanks to a new FIRST update.</font><br><br>
 
#Drill mounting holes in spare mouse?
#Order any spare parts we need.
#<strike>figure out how to add conveyor shaft encoders (one on front conveyor, one on rear conveyor</strike>). [[New Sensor Mounting Ideas]]
#'''UPDATE'''&nbsp;our Electrical System Summary spreadsheet with the changes made at FLR.


<br>[[Things to Take to Competitions|List of Things to Take to the Competitions]]  
<br>[[Things to Take to Competitions|List of Things to Take to the Competitions]]  

Revision as of 20:30, 30 December 2009

Master To-Do List before Regionals

Things To Do (in no particular order):

...


List of Things to Take to the Competitions

 

Electrical Main Subteam's Engineering Notebook




Please Label All Notebook Pages 2010:Electrical Main MM.DD to avoid confusion.


Component/Component Specifications

Electrical System Summary

Jaguar Speed Controllers

Victor 884 Speed Controllers

2009 KOP Motors Spreadsheet (Chief Delphi)

Motor Characteristics

Sensors

Servos

Micro Switches

Inventory

Electrical Board Inventor

Electrical Board Cover Inventor

Mouse Details

Breaker Information

Links to Other Subteams' Important Stuff

IO_Map


Electrical Fun

Apples to Apples

Kirby.jpgHIIIIIIIIIIIIIII!!! 


Archives

2009 Electrical Main