2010:Electrical Main

From 1511Wookiee
Revision as of 08:07, 21 January 2009 by Leadership (talk | contribs) (added to do items)
Jump to navigationJump to search

This is the Electrical Main Subteam's Engineering Notebook

Week 1 - 42 Days Left!!

Electrical Main - 1.06.09
Electrical Main - 1.07.09
Electrical Main - 1.08.09
Electrical Main - 1.10.09

Electrical Main - 1.11.09

Week 2 -35 Days Left!!
Electrical Main - 1.13.09
Electrical Main - 1.14.09
Electrical Main - 1.15.09

Electrical Main - 1.17.09

Electrical Main - 1.18.09

Electrical Main - 1.20.09


Component/Component Specifications

Jaguar Speed Controllers

Victor 884 Speed Controllers

2009 KOP Motors Spreadsheet (Chief Delphi)

Motor Characteristics

Sensors

Servos

Micro Switches

Inventory

Electrical Board Inventor


Master To-Do List

  • Design "homemade" shaft encoder for conveyor motors.
  • Communicate sensor mountings to Mechanical teams.- Integration
  • How fast can we move the mouse and still not lose encoder counts.
  • Re-determine model positions
  • Order E7P Encoder
  • Assist Mechanical with Battery/CRio Mount
  • Get Set of Same Mice (backups)
  • Wire & Setup multiple Mice
  • Final Electrical Mounting Design
  • Design Protection for Electronics on Outside of Bot (or get help from Mechanical)
  • COMPLETE Bill of Materials


Links to Other Subteams' Important Stuff

IO_Map


Electrical Fun

Defining Dave Apples and Dave Oranges!!


Please Label All Notebook Pages Electrical Main X.XX.2009 to avoid confusion.