1/6/24

Work Completed:

Hanging Mechanism

  • Discussed and prototyped on CAD a spring gate hook

Game Piece Manipulation

  • Split into two groups: intake/outtake
  • Intake developed prototype with two rows of wheels
  • Outtake developed a slingshot/crossbow mechanism
  • Discussed ideas for "Trap" outtake; expanding gripper- prototype tomorrow!

KitBot

  • Took inventory of the parts received from AndyMark
  • Started building the bot from the instructions, had to modify multiple parts to fit into the frame correctly
  • Almost finished assembly, just a few more items to finish

1/7/24
Work Completed: Hanging Mechanism

Prototyped two different types of hooks

Tested both, worked well in holding on the chain and preventing slipping

Game Piece Manipulation

Started prototyping gripper for trap outtake

Two prototypes for trap: expanding gripper and "anti-chopsticks"

KitBot

Working on assembly, projected to be done on Tuesday

1/11/24 Drive Base

Continued assembly on Swerve Drives.

Worked on CAD for Drive Base:

Mk4 Swerve drive modules

Lexan belly plate

AndyMark C-channel frame (24.250in. x 24.250in.)

Support frame pieces

L-brackets

Img1705093786166.png






1/13/24;

Drive base


  • Continued assembly of swerve drive modules
  • Encoders arrived so we could resume working on the swerve drives
  • Changes size of our CAD drawing from 24.250in.x24in. to 27.250in.x24in.
  • Made CAD designs for:
      • Sponsor Panels
      • Sponsor Panel supports
      • Drive base side panels
      • Flat frame panels

1/14/24

Game Piece Manipulation:

  • Continued to CAD the shooter/intake mechanism and figured out some geometries/measurements
  • Worked on assembling prototype of mechanism