2013:Electrical Controls 01.29
From 1511Wookiee
Jump to navigationJump to search
Attendance
Start time: 6:23PM
End time: ...???
Members present: Ciana (unofficially), Ethan!, Gafei
Members Attending Next Meeting: ...not Gafei.
Tasks Completed
- Verified and exported controls cad to .stp, .pdf, and dxf files.
- Found a supplier for Logitech Attack 3 joysticks.
- Drawings are located in: S:\High School Classrooms\Harris_Robotics\2013\Mechanical\Drawings\Transmission Files
They're also in controls_cad.zip
Tasks In Progress
- Complete preliminary I/O map.
- Updated basic BOM and shopping list.
Tasks to Complete
- Determine how to paint controls.
- Lay out controls (material) on paper and verify dimensions.
Materials Needed
- Brain power
- Students
- Eric Averill
- and...Jeff, maybe.
- Anne Hathaway and more!