2013:Electrical Controls 01.29

From 1511Wookiee
Jump to navigationJump to search

Attendance

Start time: 6:23PM

End time: ...???

Members present: Ciana (unofficially), Ethan!, Gafei 

Members Attending Next Meeting: ...not Gafei.

Tasks Completed

  • Verified and exported controls cad to .stp, .pdf, and dxf files.
  • Found a supplier for Logitech Attack 3 joysticks.
  • Drawings are located in: S:\High School Classrooms\Harris_Robotics\2013\Mechanical\Drawings\Transmission Files

 They're also in controls_cad.zip

Tasks In Progress

  • Complete preliminary I/O map.
  • Updated basic BOM and shopping list.

Tasks to Complete

  • Determine how to paint controls.
  • Lay out controls (material) on paper and verify dimensions.

Materials Needed

  • Brain power
  • Students
  • Eric Averill
  • and...Jeff, maybe.
  • Anne Hathaway and more!