2013 ControlsToDoList

From 1511Wookiee
Revision as of 11:08, 9 February 2013 by ElectricalControls (talk | contribs) (Created page with "This is a list of things that need to be done to complete the operator controls when the metalwork arrives. This list should be executed in order (1, 2, 3...) so that the control...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

This is a list of things that need to be done to complete the operator controls when the metalwork arrives. This list should be executed in order (1, 2, 3...) so that the controls are assembled correctly.

1. Drill mounting holes for various control functions.

         - Joysticks
         - eStop Control Board