2024:Controls: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
mNo edit summary
 
(76 intermediate revisions by 3 users not shown)
Line 13: Line 13:
*Laptop Stand 2" high
*Laptop Stand 2" high
*Amy said that L3Harris can weld the curve for us!
*Amy said that L3Harris can weld the curve for us!
*17" by 14"
*18" by 14"
*8 inches for Controllers to lay flat (PS5)<br>
*8 inches for Controllers to lay flat (PS5)<br>
***make clips to hold in place
***make clips to hold in place
Line 20: Line 20:
*On other side of contolers:
*On other side of contolers:
***CD on top with the sliders/butons/knobs below
***CD on top with the sliders/butons/knobs below
*COLOR SCHEME:
***Black inside and out
***Red for laptop holder and bling board
***Red for controller holders
***CD is Black with Red lettering<br>
{| class="wikitable" style="border-collapse: collapse; width: 100%;"
|-
| style="width: 33.3333%;" | [[image:img1706746588200.png|thumb|300px]]
| style="width: 33.3333%;" | [[image:img1706707621396.png|thumb|300px]]
| style="width: 33.3333%;" | [[image:img1706672893435.png|thumb|300px]]
|-
| style="width: 33.3333%;" |
[[image:img1707683447924.png|thumb|300px]]
| style="width: 33.3333%;" |
<br>
| style="width: 33.3333%;" |
<br>
|}
{| class="wikitable" style="border-collapse: collapse; width: 100%;"
|-
| style="width: 33.3333%;" | [[image:img1706751770923.png|thumb|300px]]
| style="width: 33.3333%;" | [[image:img1706747498488.png|thumb|300px]]
| style="width: 33.3333%;" |
[[image:img1706671490582.png|thumb|300px]]
|-
| style="width: 33.3333%;" |
[[image:img1706748187952.png|thumb|300px]]
| style="width: 33.3333%;" |
[[image:img1706710684111.png|thumb|300px]]
| style="width: 33.3333%;" |
[[image:img1706744546008.png|thumb|300px]]
|-
| style="width: 33.3333%;" |
[[image:img1706696032371.png|thumb|300px]]
| style="width: 33.3333%;" |
[[image:img1706666890585.png|thumb|300px]]
| style="width: 33.3333%;" |
[[image:img1706691466339.png|thumb|300px]]
|}


= Concept Drawings/Ideas: =
= Concept Drawings/Ideas: =
Line 60: Line 100:
= Design Info: =
= Design Info: =
'''''CADed parts:'''''
'''''CADed parts:'''''
*<span style="background-color: rgb(248, 202, 198);">Amp Box</span>
*<span>Amp Box</span>
*<span style="background-color: rgb(191, 237, 210);">Speaker</span>
*<span>Speaker</span>
*<span style="background-color: rgb(191, 237, 210);">Laptop Stand (Refined 2016 Design)</span>
*<span>Laptop Stand (Refined 2016 Design)</span>
*<span style="background-color: rgb(191, 237, 210);">Speaker Curve</span>
*<span>Speaker Curve</span>
'''''3D printed parts:'''''
'''''3D printed parts:'''''
*<span style="background-color: rgb(248, 202, 198);"><span><span>Controller Cord Holder (</span></span>Refine 2023s)</span>
*<span><span><span>Controller Cord Holder (</span></span>Refine 2023s)&nbsp;</span>
*<span style="background-color: rgb(248, 202, 198);">Latches for Controllers:</span>&nbsp;
***https://www.thingiverse.com/thing:4668566
*<span style="background-color: rgb(248, 202, 198);">Post for CD: </span>
*<span>Latches for Controllers:</span>&nbsp;
***https://www.thingiverse.com/thing:4667850
***https://www.thingiverse.com/thing:5139713
***https://www.thingiverse.com/thing:5228115
***https://www.thingiverse.com/thing:5177092
***https://www.thingiverse.com/thing:5918348
***https://www.thingiverse.com/thing:5959708
*<span>Post for CD:</span>
***<span>https://www.amazon.com/uxcell-Encoder-Digital-Potentiometer-D-Shaft/dp/B07R6BZVBT/ref=sr_1_18?crid=SRJFGIJT5L8A&keywords=potentiometer+rotary+encoder&qid=1706402484&sprefix=potentiometer+rotary+encoder%2Caps%2C74&sr=8-18#customerReviews</span>
'''''Bling:'''''
'''''Bling:'''''
*<span style="background-color: rgb(248, 202, 198);">CD</span>
*<span>CD</span>
*<span style="background-color: rgb(191, 237, 210);">Mesh</span><br>
*<span>Mesh</span><br>
*<span style="background-color: rgb(191, 237, 210);">Sliders:https://www.amazon.com/DAOKI-Logarithmic-Potentiometer-Arduino-Electronic/dp/B08SLPV4VD/ref=sr_1_19?dib=eyJ2IjoiMSJ9.TPGHYcRx8gEp9Qu1J2X4ad3zPT6v9ROndBU2d8Z86z7GjHj071QN20LucGBJIEps.rzujEJDQiAoS6N6jHZHtdidER6KmgsBBf9haxaxN7Fk&dib_tag=se&keywords=Slide+Potentiometer&qid=1705260984&sr=8-19</span>
*<span>Sliders: Hole pem: BSO-632-12zi&nbsp; &nbsp; &nbsp; Hole size: 0.213&nbsp; &nbsp; &nbsp; &nbsp; &nbsp; Center line to edge:&nbsp; &nbsp;0.27</span>
*<span style="background-color: rgb(191, 237, 210);">Knobs</span>
*<span>:https://www.amazon.com/DAOKI-Logarithmic-Potentiometer-Arduino-Electronic/dp/B08SLPV4VD/ref=sr_1_19?dib=eyJ2IjoiMSJ9.TPGHYcRx8gEp9Qu1J2X4ad3zPT6v9ROndBU2d8Z86z7GjHj071QN20LucGBJIEps.rzujEJDQiAoS6N6jHZHtdidER6KmgsBBf9haxaxN7Fk&dib_tag=se&keywords=Slide+Potentiometer&qid=1705260984&sr=8-19</span>
*<span style="background-color: rgb(251, 238, 184);">Handle:</span><span style="background-color: rgb(251, 238, 184);">https://www.amazon.com/dp/B07RXYDF7J/ref=sspa_dk_detail_0?pd_rd_i=B07RWZCTQP&pd_rd_w=bOttE&content-id=amzn1.sym.eb7c1ac5-7c51-4df5-ba34-ca810f1f119a&pf_rd_p=eb7c1ac5-7c51-4df5-ba34-ca810f1f119a&pf_rd_r=E72HN4Z8R5K007Q63W0J&pd_rd_wg=KMYE7&pd_rd_r=6f6c48e5-ec30-433d-a826-e7408fcee31f&s=musical-instruments&sp_csd=d2lkZ2V0TmFtZT1zcF9kZXRhaWw&th=1</span>
*<span>Knobs</span>
*<span style="background-color: rgb(191, 237, 210);"><span>Broken Switch</span></span>
*<span>Handle:</span><span>https://www.amazon.com/dp/B07RXYDF7J/ref=sspa_dk_detail_0?pd_rd_i=B07RWZCTQP&pd_rd_w=bOttE&content-id=amzn1.sym.eb7c1ac5-7c51-4df5-ba34-ca810f1f119a&pf_rd_p=eb7c1ac5-7c51-4df5-ba34-ca810f1f119a&pf_rd_r=E72HN4Z8R5K007Q63W0J&pd_rd_wg=KMYE7&pd_rd_r=6f6c48e5-ec30-433d-a826-e7408fcee31f&s=musical-instruments&sp_csd=d2lkZ2V0TmFtZT1zcF9kZXRhaWw&th=1</span>
*<span style="background-color: rgb(251, 238, 184);"><span>Hinge:</span> https://www.amazon.com/Stainless-Continuous-Hinge-Bright-Annealed/dp/B07S85MT9G/ref=asc_df_B07S85MT9G/?tag=hyprod-20&linkCode=df0&hvadid=673687118827&hvpos=&hvnetw=g&hvrand=8210718651493454702&hvpone=&hvptwo=&hvqmt=&hvdev=c&hvdvcmdl=&hvlocint=&hvlocphy=1022882&hvtargid=pla-2203756691906&mcid=1d09b215000b371ea1ed399b883ea19d&th=1</span>
*<span><span>Broken Switch</span></span>
*<span style="background-color: rgb(251, 238, 184);"><span>Latches:</span> https://www.amazon.com/Penn-Elcom-L905-915Z-Butterfly-Latch/dp/B0006MZM8C/ref=sr_1_1?crid=3L3JKQUI3382C&dib=eyJ2IjoiMSJ9.ikSRrhyztVV-cwtSOgsL5N9MQrj0yXdkknYo9O295nbGjHj071QN20LucGBJIEps.UrzAt-NcigkVOzg1_JWikJXfYB5BwhpCTs_2GFVoQRo&dib_tag=se&keywords=L905%2F915Z&qid=1705276754&s=hi&sprefix=l905%2F915z%2Ctools%2C87&sr=1-1&th=1</span>
*<span><span>Hinge:</span> https://www.amazon.com/Stainless-Continuous-Hinge-Bright-Annealed/dp/B07S85MT9G/ref=asc_df_B07S85MT9G/?tag=hyprod-20&linkCode=df0&hvadid=673687118827&hvpos=&hvnetw=g&hvrand=8210718651493454702&hvpone=&hvptwo=&hvqmt=&hvdev=c&hvdvcmdl=&hvlocint=&hvlocphy=1022882&hvtargid=pla-2203756691906&mcid=1d09b215000b371ea1ed399b883ea19d&th=1</span>
***<span style="background-color: rgb(251, 238, 184);">https://www.amazon.com/Reliable-Hardware-Company-RH-A3020BK-Butterfly/dp/B00JQYUEAC/ref=asc_df_B00JQYUEAC/?tag=hyprod-20&linkCode=df0&hvadid=193151859311&hvpos=&hvnetw=g&hvrand=7275364316301943114&hvpone=&hvptwo=&hvqmt=&hvdev=c&hvdvcmdl=&hvlocint=&hvlocphy=1022882&hvtargid=pla-311878510313&psc=1&mcid=c0c715df6e843da9a6691f7002e846ab&gclid=EAIaIQobChMI1aSI7svWgwMVIElHAR18AwwSEAQYCSABEgISdvD_BwE</span>
*<span><span>Latches:</span> https://www.amazon.com/Penn-Elcom-L905-915Z-Butterfly-Latch/dp/B0006MZM8C/ref=sr_1_1?crid=3L3JKQUI3382C&dib=eyJ2IjoiMSJ9.ikSRrhyztVV-cwtSOgsL5N9MQrj0yXdkknYo9O295nbGjHj071QN20LucGBJIEps.UrzAt-NcigkVOzg1_JWikJXfYB5BwhpCTs_2GFVoQRo&dib_tag=se&keywords=L905%2F915Z&qid=1705276754&s=hi&sprefix=l905%2F915z%2Ctools%2C87&sr=1-1&th=1</span>
*<span style="background-color: rgb(248, 202, 198);">Grippies:</span>&nbsp;
***<span>https://www.amazon.com/Reliable-Hardware-Company-RH-A3020BK-Butterfly/dp/B00JQYUEAC/ref=asc_df_B00JQYUEAC/?tag=hyprod-20&linkCode=df0&hvadid=193151859311&hvpos=&hvnetw=g&hvrand=7275364316301943114&hvpone=&hvptwo=&hvqmt=&hvdev=c&hvdvcmdl=&hvlocint=&hvlocphy=1022882&hvtargid=pla-311878510313&psc=1&mcid=c0c715df6e843da9a6691f7002e846ab&gclid=EAIaIQobChMI1aSI7svWgwMVIElHAR18AwwSEAQYCSABEgISdvD_BwE</span><span>Music Font: https://www.dafont.com/lasolsi-figuras.font</span>
*<span style="background-color: rgb(191, 237, 210);">Music Font: https://www.dafont.com/lasolsi-figuras.font</span>
*<span>Speaker and Mp3 Player</span>
 
***<span>https://www.amazon.com/MakerHawk-Full-Range-Advertising-Connector-Separating/dp/B07GJ4GH67/ref=cm_cr_arp_d_product_top?ie=UTF8&th=1</span>
= To-Do: =
***<span>https://www.amazon.com/dp/B089D5NLW1?psc=1&ref=ppx_yo2ov_dt_b_product_details Amazon.com</span><span></span>
 
*<span>Bling PCB</span>
*<span class="s2">Put CAD into Wookie</span>
***<span>Arduino Nano Every - https://www.amazon.com/Arduino-Nano-Every-headers-Mounted/dp/B07WWK29XF/ref=sr_1_6?crid=T4JY1BTPQI3D&keywords=nano+every&qid=1706469396&sprefix=nano+every%2Caps%2C90&sr=8-6</span>
*<span class="s2">Final Assembly&nbsp;</span><br>
*****<span>pinout: https://content.arduino.cc/assets/Pinout-NANOevery_latest.pdf</span>
*Bling
*****<span>8 Analog Inputs:</span>
 
*******<span>sliders: 1) volume (A0); 2) LED brightness (A1); 3) LED pattern speed (A2); 4) TBD (A3)</span>
<span style="font-size: 18pt;">Not Started:</span><span class="s2"></span>
*******<span>knobs: 1) on/off (A4); 2) EQ (A5); 3) song selection (A6); 4) pattern selection (A7)</span>
*<span class="s2">Put CAD into Wookie</span>
*****<span>Digital Outputs:</span>
*******<span>LED control signal (D5)</span>
*****<span>Digital Inputs:</span>
*******<span>CD encoder (D9 & D10) [Arduino can handle 5V on input pin]</span>
*****<span>NOTE: leave room for USB cable to connect</span><span></span>
***<span>MP3 Player - https://wiki.dfrobot.com/DFPlayer_Mini_SKU_DFR0299</span>
*****<span>VCC to Arduino 5V</span>
*****<span>RX to 1K resistor to Arduino TX (yes RX goes to TX)</span>
*****<span>TX to Arduino RX</span>
*****<span>SPK_1 to both speaker red wires</span>
*****<span>GND to Arduino GND</span>
*****<span>SPK_2 to both speaker black wires</span><span></span>
*****<span>NOTE: leave room to get SD card in and out</span>
***<span>Sliders (4.6K ohm):</span>
*****<span>OTB pin goes to Arduino (A0 thru A3); GND pin to Arduino ground</span>
***<span>Knobs: (10K ohm):</span>
*****<span>center pin to Arduino (A4 thru A7); GND pin to Arduino ground</span>
***<span>Speaker:</span>
*****<span>red to MP3 pin SPK_1; black to MP3 pin SPK_2</span>
***<span>Encoder: see customer picture in reviews - https://www.amazon.com/uxcell-Encoder-Digital-Potentiometer-D-Shaft/dp/B07R6BZVBT/ref=sr_1_18?crid=SRJFGIJT5L8A&keywords=potentiometer+rotary+encoder&qid=1706402484&sprefix=potentiometer+rotary+encoder%2Caps%2C74&sr=8-18#customerReviews</span>
*****<span>A to Arduino D9</span>
*****<span>Common to Arduino GND</span>
*****<span>B to Arduino D10</span>
*****<span>VCC pin to Arduino 5V</span>
***<span>LEDs: needs capacitor and resister circuit we have always used</span>
*****<span>Arduino 5V to LED strip 5V and Cap + (330uf or 470uf)</span>
*****<span>Arduino GND to LED strip GND and Cap -</span>
*****<span>Arduino D5 to resistor (120ohm ?) to LED Signal</span><span></span>


= In Process: =
<span></span>'''
<span style="font-size: 18pt;">To-Do:</span><span class="s2"></span>


'''
<span style="font-size: 18pt;">Not Started:</span>'''


 
'''<span style="font-size: 18pt;">In Process:</span>'''
*<span class="s2">Final Assembly</span><br>
= '''Completed:''' =
 
= Completed: =
*Added sections to the 2024: Controls page
*Added sections to the 2024: Controls page
*Read and added Driver Station specs and the rules for the controls
*Read and added Driver Station specs and the rules for the controls
Line 112: Line 188:
***Update Assembly Log<span class="s2"></span>
***Update Assembly Log<span class="s2"></span>
*Put 2 copies in shop drawing binder
*Put 2 copies in shop drawing binder
*Completed STEP files for the parts
*Color scheme
*<span class="s2">Put CAD into Wookie</span>
*<span class="s2">Final Assembly</span>
*<span class="s2">Finish CD design</span>
*<span class="s2">Figured out how to do the sound</span>
*<span class="s2">CAD bling board</span>
*<span class="s2">Final Final Assembly</span><span class="s2"></span>
*<span class="s2">Mapped out Ardino on paper</span>
*<span class="s2">Wire bling board</span><span class="s2"></span>
*<span class="s2">Printed Post for the CD</span>
*<span class="s2" style="font-size: 10pt;">Measure speaker mesh</span>
*<span style="font-size: 12pt;"><span class="s2">see how speaker looks against black (white border or no) (NO White border)</span><span class="s2"></span></span>
*<span style="font-size: 12pt;"><span style="background-color: #e67e23;">''<span style="text-decoration: underline;">'''Takes Tools test(100%)'''</span>''</span><span class="s2"></span></span>
*<span class="s2" style="background-color: rgb(230, 126, 35); font-size: 12pt;">post controller holder files in teams</span>
*<span style="font-size: 12pt;">Where to mount handle?</span>
*<span style="font-size: 12pt;">Mount and drill holes for latch</span>
*<span style="font-size: 12pt;">Dry fit of controls</span>
*<span style="font-size: 12pt;">Test post for the CD</span><span class="s2" style="background-color: #e67e23;"></span>
*<span style="font-size: 12pt;"><span>Find double sided tape for LED strips</span></span>
*<span style="font-size: 12pt;">Test ethernet cable<span></span></span>
*<span style="font-size: 12pt;">Find USB hub</span>
*<span style="font-size: 12pt;">Find right angle ethernet connector</span><br>
*<span style="font-size: 12pt;">Find LED strips</span>
*Wired and tested LED Strips<span style="font-size: 12pt;"></span>
*<span style="background-color: rgb(230, 126, 35); font-size: 12pt;">''<span style="text-decoration: underline;">'''Clean up Controls Shelf in Shop Closet'''</span>''</span>
*<span style="font-size: 12pt;"><span>Paint controls</span></span>
*<span style="font-size: 12pt;"><span><span>Attach Velcro on other controller holder</span></span></span>
*<span style="font-size: 12pt;"><span><span><span style="background-color: rgb(230, 126, 35);">''<span style="text-decoration: underline;">'''Take Game test(100%)'''</span>''</span></span></span></span>
*<span style="font-size: 14pt;"><span style="font-size: 12pt;">Picture for speaker for outside</span><span></span></span>
*<span style="font-size: 14pt;"><span style="font-size: 12pt;">Filmed and edit controls video</span></span>


= Meeting Minutes: =
= Meeting Minutes: =
Line 190: Line 297:
*Finished CADing the cutouts
*Finished CADing the cutouts
*Created Closer Alignment piece
*Created Closer Alignment piece
*Color scheme
*<span class="s2">Put CAD into Wookie</span>
*<span class="s2">Final Assembly</span>


<span style="font-size: 14pt;">'''<span>1/17 (Wed)</span>'''</span>
<span style="font-size: 14pt;">'''<span>1/17 (Wed)</span>'''</span>
Line 205: Line 315:
*<span style="font-size: 14pt;">Shop Drawings</span>
*<span style="font-size: 14pt;">Shop Drawings</span>


<span style="font-size: 14pt;">'''<span>1/20 (Sat)</span>'''</span>
<span style="font-size: 14pt;">'''<span>1/20 (Sat) (INTERGRATION @ 11:30am!)</span>'''</span>


<span style="font-size: 14pt;">Attendees: Sami, Byers, Eric</span>
<span style="font-size: 14pt;">Attendees: Sami, Byers, Eric</span>
Line 222: Line 332:
*<span class="s2">Shop Drawings</span>
*<span class="s2">Shop Drawings</span>
***Update Assembly Log
***Update Assembly Log
*Put 2 copies in shop drawing binder
*Put 2 copies in shop drawing binder<br>
*
*Created CD design ideas


<span style="font-size: 14pt;">'''<span>1/23 (Tue)</span>'''</span>
<span style="font-size: 14pt;">'''<span>1/23 (Tue) (INTERGRATION @ 6:30pm!)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami, Eric</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*<span style="font-size: 14pt;">Created STEP files for Top, Bottom, and Laptop Holder</span><br>
*<span style="font-size: 14pt;">Started cutouts for bling board</span>
*<span style="font-size: 14pt;">Tested</span>


<span style="font-size: 14pt;">'''<span>1/24 (Wed)</span>'''</span>
<span style="font-size: 14pt;">'''<span>1/24 (Wed)</span>'''</span>
Line 239: Line 352:
<span style="font-size: 14pt;">'''<span>1/25 (Thu)</span>'''</span>
<span style="font-size: 14pt;">'''<span>1/25 (Thu)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami, Byers</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*Worked on the bling board
*Sent controller holder tests to Mr. Weisbord


<span style="font-size: 14pt;">'''<span>1/27 (Sat)</span>'''</span>
<span style="font-size: 14pt;">'''<span>1/27 (Sat)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami, Byers, Eric</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*Tested sliders
*Finalized where things went on bling board
*Obtained SD card, latch, and speakers
*Finalized CD design


<span style="font-size: 14pt;">'''<span>1/28 (Sun)</span>'''</span>
<span style="font-size: 14pt;">'''<span>1/28 (Sun)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami, Byers</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*Made Shop drawings for the 3D parts
*Cleaned up the 3D parts for TESTING
*Shop drawing for bling board
***All other tasks completed to for it
*Made a new controller holder design
***sent it in with all its requirments


<span style="font-size: 14pt;">'''<span>1/30 (Tue)</span>'''</span>
<span style="font-size: 14pt;">'''<span>1/30 (Tue)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami, Eric</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
 
*Final Final Assembly
*Mapped out Ardino on paper
*gathered supplies and put it in RED bin for the Ardino board
*Made copies of the paper so we each have a copy and don"t lose things
'''<span style="font-size: 14pt;">1/31 (Wed)</span>'''
'''<span style="font-size: 14pt;">1/31 (Wed)</span>'''


Line 269: Line 397:
<span style="font-size: 14pt;">'''<span>2/1 (Thu)</span>'''</span>
<span style="font-size: 14pt;">'''<span>2/1 (Thu)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami, Chris</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*I stole Chris cause he can do Adobe Illistaror
*worked on speaker
*I tested holder, it fit i think


<span style="font-size: 14pt;">'''<span>2/3 (Sat)</span>'''</span>
<span style="font-size: 14pt;">'''<span>2/3 (Sat)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami, Byers, Eric</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*Modified Controller holder and sent in
*Made a the CD post and sent in
*<span class="s2">Wire bling board</span>


<span style="font-size: 14pt;">'''<span>2/4 (Sun)</span>'''</span>
<span style="font-size: 14pt;">'''<span>2/4 (Sun)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami, Byers</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*Worked on code for bling
*conected wires to sliders and knobs
*Found hardware
*debugged and fixed bling board
*started painting the laptop holder
*ferifed controller holder
*started another controller holder
*printed CD onto a label
*Took Tools Test


<span style="font-size: 14pt;">'''<span>2/6 (Tue)</span>'''</span>
<span style="font-size: 14pt;">'''<span>2/6 (Tue)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami</span>
 
<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*Took Tools test
*Obtained post for CD, still need to test
*Measured speaker mesh, almost every part could fit, so a lot to work with for options
*Found out that 3D printer DIED, like dead, dead
*NO White border for speaker


<span style="font-size: 14pt;">'''<span>2/7 (Wed)</span>'''</span>
<span style="font-size: 14pt;">'''<span>2/7 (Wed)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;"></span>
*<span style="background-color: #e67e23;">''<span style="text-decoration: underline;">'''Takes Tools test(100%)'''</span>''</span>
*<span class="s2" style="background-color: #e67e23;">post controller holder files in teams<br></span>
*<span class="s2">Downloaded STEP file for cable holder</span>


<span style="font-size: 14pt;">'''<span>2/8 (Thu)</span>'''</span>
<span style="font-size: 14pt;">'''<span>2/8 (Thu)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*Organized To-Do list


<span style="font-size: 14pt;">'''<span>2/10 (Sat)</span>'''</span>
<span style="font-size: 14pt;">'''<span>2/10 (Sat)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami, Byers</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*Test fitted new parts (all)
<span style="font-size: 14pt;"></span>
*Sent back bling board (standoffs where not pressed in)
*Finished CD
*Velcroed laptop and holder
*Started painting
*Made holes for latch/handle
*Made holes for controller holder
*<span style="font-size: 12pt;">Find double sided tape for LED strips</span>


<span style="font-size: 14pt;">'''<span>2/11 (Sun)</span>'''</span>
<span style="font-size: 14pt;">'''<span>2/11 (Sun)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami, Byers, Eric</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*Painted controls
*Tested ethernet cable
*Cleaned out closet
*Ordered USB hub
*Ordered right angle ethernet
*Found LED Strips
*Wired and tested LED Strips


<span style="font-size: 14pt;">'''<span>2/13 (Tue)</span>'''</span>
<span style="font-size: 14pt;">'''<span>2/13 (Tue)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami, Byers, Eric</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*<span style="font-size: 12pt;">Paint control</span>
<span style="font-size: 14pt;"></span>
*<span style="font-size: 12pt;"><span>Attach Velcro on other controller holder</span><span style="font-size: 14pt;"></span></span>
*<span style="font-size: 12pt;"><span>Took Game Test (11/42;16/42)</span></span>
*<span style="font-size: 12pt;"><span>Did other Final Assembly Things</span></span>


<span style="font-size: 14pt;">'''<span>2/14 (Wed)</span>'''</span>
<span style="font-size: 14pt;">'''<span>2/14 (Wed)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*Took Game Test (25/42;24/42)


<span style="font-size: 14pt;">'''<span>2/15 (Thu)</span>'''</span>
<span style="font-size: 14pt;">'''<span>2/15 (Thu)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami</span>
 
<span style="font-size: 14pt;">Work Completed:</span>
*Took Game Test (31/42;37/42)


<span style="font-size: 12pt;"></span>
'''
<span style="font-size: 14pt;">2/16 (Fri)</span>'''
<span style="font-size: 14pt;">Attendees: Sami</span>
<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*Took Game Test (40/42;42/42)
*Put three sliders on bord


<span style="font-size: 14pt;">'''<span>2/17 (Sat)</span>'''</span>
<span style="font-size: 14pt;">'''<span>2/17 (Sat)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami, Gracie, Byers, Eric</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*COMPLETED THE CONTROLS!:)


<span style="font-size: 14pt;">'''<span>2/18 (Sun)</span>'''</span>
<span style="font-size: 14pt;">'''<span>2/18 (Sun)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami, Byers</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
*Refined the code


<span style="font-size: 14pt;">'''<span>2/20 (Tue)</span>'''</span>
<span style="font-size: 14pt;">'''<span>2/20 (Tue)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Sami, Shopia, Brennan</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>
****
<span style="font-size: 14pt;">Filmed and edit controls video</span>


<span style="font-size: 14pt;">'''<span>2/21 (Wed)</span>'''</span>
<span style="font-size: 14pt;">'''<span>2/21 (Wed)</span>'''</span>
Line 395: Line 588:
<span style="font-size: 14pt;">'''<span>3/2 (Sat)</span>'''</span>
<span style="font-size: 14pt;">'''<span>3/2 (Sat)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Byers</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>


<span style="font-size: 14pt;">Labelled broken switches.</span>
<span style="font-size: 14pt;">Tweaked the controller cable clip.</span>
<span style="font-size: 14pt;">'''<span>3/3 (Sun)</span>'''</span>
<span style="font-size: 14pt;">'''<span>3/3 (Sun)</span>'''</span>


Line 425: Line 620:
<span style="font-size: 14pt;">'''<span>3/9 (Sat)</span>'''</span>
<span style="font-size: 14pt;">'''<span>3/9 (Sat)</span>'''</span>


<span style="font-size: 14pt;">Attendees:</span>
<span style="font-size: 14pt;">Attendees: Byers</span>


<span style="font-size: 14pt;">Work Completed:</span>
<span style="font-size: 14pt;">Work Completed:</span>


<span style="font-size: 14pt;">Controller holder clip needed more changes.</span>
<span style="font-size: 14pt;">'''<span>3/10 (Sun)</span>'''</span>
<span style="font-size: 14pt;">'''<span>3/10 (Sun)</span>'''</span>


Line 466: Line 662:
<span style="font-size: 10pt;">'''R906 *No unsafe OPERATOR CONSOLES.''' OPERATOR CONSOLES shall not be made using hazardous<br>materials, be unsafe, cause an unsafe condition, or interfere with other DRIVE TEAMS or the operation<br>of other ROBOTS.</span>
<span style="font-size: 10pt;">'''R906 *No unsafe OPERATOR CONSOLES.''' OPERATOR CONSOLES shall not be made using hazardous<br>materials, be unsafe, cause an unsafe condition, or interfere with other DRIVE TEAMS or the operation<br>of other ROBOTS.</span>


<span style="font-size: 18pt;">2024 Controller Map</span>
[[File:2024 ControllerMapv2 scaled2.png|300px|border]]
= Archives =
= Archives =
*[[2023:Controls]]
*[[2023:Controls]]

Latest revision as of 11:02, 9 March 2024

PROs and CONs List from previous years:

  • PROs:
      • Retractable handles
      • Any other latches than roller latches
      • Long hinges
      • MEASURING correctly!:)
  • CONs:
      • Roller latches (they can't hold weight)
      • Zippers (they break)

Overall Concept:

  • Laptop Stand 2" high
  • Amy said that L3Harris can weld the curve for us!
  • 18" by 14"
  • 8 inches for Controllers to lay flat (PS5)
      • make clips to hold in place
  • Fixed handle
      • Latch underneath?
  • On other side of contolers:
      • CD on top with the sliders/butons/knobs below
  • COLOR SCHEME:
      • Black inside and out
      • Red for laptop holder and bling board
      • Red for controller holders
      • CD is Black with Red lettering
Img1706746588200.png
Img1706707621396.png
Img1706672893435.png
Img1707683447924.png



Img1706751770923.png
Img1706747498488.png
Img1706671490582.png
Img1706748187952.png
Img1706710684111.png
Img1706744546008.png
Img1706696032371.png
Img1706666890585.png
Img1706691466339.png

Concept Drawings/Ideas:

  • Paint splatter? again
  • Amp, speaker, or road case as the actual box
      • 3D printed nobs
      • handle
      • reuse/improve controller cord holder (only if PS5)
      • Team name in the CREScenDO outline?
      • Controls paper for laptop
      • Chicken wire to resemble mesh
      • Fake 1511 CDs
Img1704659701700.png
Img1704688430021.png
Img1704740205336.png
Img1704665856131.png
Img1704718261328.png
Img1704717253904.png







Design Info:

CADed parts:

  • Amp Box
  • Speaker
  • Laptop Stand (Refined 2016 Design)
  • Speaker Curve

3D printed parts:

Bling:

To-Do:

Not Started:

In Process:

Completed:

  • Added sections to the 2024: Controls page
  • Read and added Driver Station specs and the rules for the controls
  • Linked game manual to "Controls Rules 2024:" section
  • Added all Build Season dates to page
  • PROs and CONs list from previous years
  • Brainstorm ideas for controls
  • What kind of controllers do they want?- Ask (Main) Sasha, Coleston, Calla, Morgan (2nd) Sophia, Nadia
  • Finish CADing the controls
      • Cutouts on the sides (music notes as ROLLING THUNDER and 20th Anniversary)
      • Support Beams/ Connecters so cutouts won’t break or fall out
      • Other location for PEM Studs
  • Find the appropriate handle
  • Shop Drawings
      • Update Assembly Log
  • Put 2 copies in shop drawing binder
  • Completed STEP files for the parts
  • Color scheme
  • Put CAD into Wookie
  • Final Assembly
  • Finish CD design
  • Figured out how to do the sound
  • CAD bling board
  • Final Final Assembly
  • Mapped out Ardino on paper
  • Wire bling board
  • Printed Post for the CD
  • Measure speaker mesh
  • see how speaker looks against black (white border or no) (NO White border)
  • Takes Tools test(100%)
  • post controller holder files in teams
  • Where to mount handle?
  • Mount and drill holes for latch
  • Dry fit of controls
  • Test post for the CD
  • Find double sided tape for LED strips
  • Test ethernet cable
  • Find USB hub
  • Find right angle ethernet connector
  • Find LED strips
  • Wired and tested LED Strips
  • Clean up Controls Shelf in Shop Closet
  • Paint controls
  • Attach Velcro on other controller holder
  • Take Game test(100%)
  • Picture for speaker for outside
  • Filmed and edit controls video

Meeting Minutes:

1/6 (KICKOFF!) (Sat)

Attendees: Sami, Lisa

Work Completed:

  • Added sections to the 2024: Controls page
  • Read and added Driver Station specs and the rules for the controls
  • Linked game manual to "Controls Rules 2024:" section
  • Started brainstorming different ideas for controls
  • Started a PROs and CONs list from previous years
  • Created a Concept Drawing/I Don't Knows/Concerns
  • Added all Build Season dates to page

1/7 (Sun)

Attendees: Sami, Byers, Eric, Sophia

Work Completed:

  • Created some more concept designs
  • Took apart two old Control Cases
  • Finished PROs and CONs list

1/9 (Tue)

Attendees: (N/A due to virtual meeting)

Work Completed: (N/A due to virtual meeting)

1/10 (Wed) Attendees: Sami, Byers Work Completed:

  • Looked deeper into the controls design
  • Asked Sasha what controllers; she then asked Calla; waiting now

1/11 (Thu)

Attendees: Sami, Monika, Geoff

Work Completed:

  • Added to the Design Info section, about bling, CAD, and 3D prints
  • Geoff attempted to help attempt CAD the controls
  • PS5s are being used: confirmed by Sasha and Calla
  • Added some links to items that will be needed and others
  • CADed a curve and a almost box

1/13 (Sat) (INTERGRATION @ 11:30am!)

Attendees: Sami, Erin, Byers, Monika, Robert

Work Completed:

  • Sami CADed like a pro:)
  • Prepared for Intergration
      • They would like the controls to be smaller than 2023
  • Discused the final design
  • Started assembly/CAD

1/14 (Sun)

Attendees: Sami, Byers, Eric

Work Completed:

  • Created notches for the hinge
  • Notch for Hinge and Latch
  • Holes for Laptop and Bling
  • CADed alot (almost done)

1/16 (Tue) (INTERGRATION @ 6:30pm!)

Attendees: Sami, Sophia, Erin, Eric

Work Completed:

  • Finished CADing the cutouts
  • Created Closer Alignment piece
  • Color scheme
  • Put CAD into Wookie
  • Final Assembly

1/17 (Wed)

Attendees:

Work Completed:

1/18 (Thu)

Attendees: Sami, Byers

Work Completed:

  • CADed
  • Shop Drawings

1/20 (Sat) (INTERGRATION @ 11:30am!)

Attendees: Sami, Byers, Eric

Work Completed:

  • Power and Ethernet CADed
  • More shop drawings finished

1/21 (Sun)

Attendees: Sami, Byers, Eric, Sophia Work Completed:

  • Find the appropriate handle

  • Shop Drawings
      • Update Assembly Log
  • Put 2 copies in shop drawing binder
  • Created CD design ideas

1/23 (Tue) (INTERGRATION @ 6:30pm!)

Attendees: Sami, Eric

Work Completed:

  • Created STEP files for Top, Bottom, and Laptop Holder
  • Started cutouts for bling board
  • Tested

1/24 (Wed)

Attendees:

Work Completed:

1/25 (Thu)

Attendees: Sami, Byers

Work Completed:

  • Worked on the bling board
  • Sent controller holder tests to Mr. Weisbord

1/27 (Sat)

Attendees: Sami, Byers, Eric

Work Completed:

  • Tested sliders
  • Finalized where things went on bling board
  • Obtained SD card, latch, and speakers
  • Finalized CD design

1/28 (Sun)

Attendees: Sami, Byers

Work Completed:

  • Made Shop drawings for the 3D parts
  • Cleaned up the 3D parts for TESTING
  • Shop drawing for bling board
      • All other tasks completed to for it
  • Made a new controller holder design
      • sent it in with all its requirments

1/30 (Tue)

Attendees: Sami, Eric

Work Completed:

  • Final Final Assembly
  • Mapped out Ardino on paper
  • gathered supplies and put it in RED bin for the Ardino board
  • Made copies of the paper so we each have a copy and don"t lose things

1/31 (Wed)

Attendees:

Work Completed:

2/1 (Thu)

Attendees: Sami, Chris

Work Completed:

  • I stole Chris cause he can do Adobe Illistaror
  • worked on speaker
  • I tested holder, it fit i think

2/3 (Sat)

Attendees: Sami, Byers, Eric

Work Completed:

  • Modified Controller holder and sent in
  • Made a the CD post and sent in
  • Wire bling board

2/4 (Sun)

Attendees: Sami, Byers

Work Completed:

  • Worked on code for bling
  • conected wires to sliders and knobs
  • Found hardware
  • debugged and fixed bling board
  • started painting the laptop holder
  • ferifed controller holder
  • started another controller holder
  • printed CD onto a label
  • Took Tools Test

2/6 (Tue)

Attendees: Sami Work Completed:

  • Took Tools test
  • Obtained post for CD, still need to test
  • Measured speaker mesh, almost every part could fit, so a lot to work with for options
  • Found out that 3D printer DIED, like dead, dead
  • NO White border for speaker

2/7 (Wed)

Attendees: Sami

Work Completed:

  • Takes Tools test(100%)
  • post controller holder files in teams
  • Downloaded STEP file for cable holder

2/8 (Thu)

Attendees: Sami

Work Completed:

  • Organized To-Do list

2/10 (Sat)

Attendees: Sami, Byers

Work Completed:

  • Test fitted new parts (all)

  • Sent back bling board (standoffs where not pressed in)
  • Finished CD
  • Velcroed laptop and holder
  • Started painting
  • Made holes for latch/handle
  • Made holes for controller holder
  • Find double sided tape for LED strips

2/11 (Sun)

Attendees: Sami, Byers, Eric

Work Completed:

  • Painted controls
  • Tested ethernet cable
  • Cleaned out closet
  • Ordered USB hub
  • Ordered right angle ethernet
  • Found LED Strips
  • Wired and tested LED Strips

2/13 (Tue)

Attendees: Sami, Byers, Eric

Work Completed:

  • Paint control

  • Attach Velcro on other controller holder
  • Took Game Test (11/42;16/42)
  • Did other Final Assembly Things

2/14 (Wed)

Attendees: Sami

Work Completed:

  • Took Game Test (25/42;24/42)

2/15 (Thu)

Attendees: Sami

Work Completed:

  • Took Game Test (31/42;37/42)

2/16 (Fri) Attendees: Sami Work Completed:

  • Took Game Test (40/42;42/42)
  • Put three sliders on bord

2/17 (Sat)

Attendees: Sami, Gracie, Byers, Eric

Work Completed:

  • COMPLETED THE CONTROLS!:)

2/18 (Sun)

Attendees: Sami, Byers

Work Completed:

  • Refined the code

2/20 (Tue)

Attendees: Sami, Shopia, Brennan

Work Completed:


Filmed and edit controls video

2/21 (Wed)

Attendees:

Work Completed:

2/22 (Thu)

Attendees:

Work Completed:

2/24 (Sat)

Attendees:

Work Completed:

2/25 (RALLY!) (Sun)

Attendees:

Work Completed:

2/27 (Tue)

Attendees:

Work Completed:

2/28 (Wed)

Attendees:

Work Completed:

2/29 (Thu)

Attendees:

Work Completed:

3/2 (Sat)

Attendees: Byers

Work Completed:

Labelled broken switches. Tweaked the controller cable clip. 3/3 (Sun)

Attendees:

Work Completed:

3/5 (Tue)

Attendees:

Work Completed:

3/6 (Wed)

Attendees:

Work Completed:

3/7 (Thu)

Attendees:

Work Completed:

3/9 (Sat)

Attendees: Byers

Work Completed:

Controller holder clip needed more changes. 3/10 (Sun)

Attendees:

Work Completed:

3/12 (Tue)

Attendees:

Work Completed:

3/13 (Wed)

Attendees:

Work Completed:

Controls Rules 2024: https://firstfrc.blob.core.windows.net/frc2024/Manual/2024GameManual.pdf

Img1704601245110.png

A DRIVER STATION is 1 of 3 assemblies within an ALLIANCE WALL behind which a DRIVE TEAM operates their
ROBOT. Each DRIVER STATION is made from a 3 ft. ¾ in. (~93 cm) tall diamond plate base topped with a 3 ft. 6 in. (~107 cm) tall transparent plastic sheet and a top rail. An aluminum shelf is attached to each DRIVER
STATION to support an OPERATOR CONSOLE. The shelf is 5 ft. 9 in. (~175 cm) wide and 1 ft. ¼ in. (~31 cm)
deep. There is a 4 ft. 6 in. (~137 cm) long by 2 in. (nominal) wide strip of hook-and-loop tape (“loop” side)
along the center of the support shelf that may be used to secure the OPERATOR CONSOLE to the shelf.

'

R901 *Use the specified Driver Station Software. The Driver Station Software provided by National
Instruments (install instructions found here) is the only application permitted to specify and
communicate the operating mode (i.e. AUTO/TELEOP) and operating state (Enable/Disable) to the
ROBOT. The Driver Station Software must be version 24.1 or newer.
[Teams are permitted to use a portable computing device of their choice (laptop
computer, tablet, etc.) to host the Driver Station Software while participating in
MATCHES.] 

R902 *The OPERATOR CONSOLE must have a visible display. The OPERATOR CONSOLE, the set of
COMPONENTS and MECHANISMS used by the DRIVERS and/or HUMAN PLAYERS to relay commands
to the ROBOT, must include a graphic display to present the Driver Station Software diagnostic
information. It must be positioned within the OPERATOR CONSOLE so that the screen display can be
clearly seen during inspection and in a MATCH.

R903 *Connect FMS Ethernet directly to the OPERATOR CONSOLE. Devices hosting the Driver Station
Software must only interface with the FMS via the Ethernet cable provided at the DRIVER STATION (e.g.
not through a switch). Teams may connect the FMS Ethernet cable to the device running the Driver
Station Software directly via an Ethernet pigtail, or with a single-port Ethernet converter (e.g. docking
station, USB-Ethernet converter, Thunderbolt-Ethernet converter, etc.). The Ethernet port on the
OPERATOR CONSOLE must be easily and quickly accessible.
[Teams are strongly encouraged to use pigtails on the Ethernet port used to
connect to the FMS. Such pigtails will reduce wear and tear on the device’s port
and, with proper strain relief employed, will protect the port from accidental
damage.]

R904 *OPERATOR CONSOLE physical requirements. The OPERATOR CONSOLE must not
A. be longer than 5 ft. (~152 cm),
B. be deeper than 1 ft. 2 in. (~35 cm) (excluding any items that are held or worn by the DRIVERS
during the MATCH),
C. extend more than 6 ft. 6 in. (~198 cm) above the floor, or
D. attach to the FIELD (except via the loop tape as described in Section 5.6.2 DRIVER STATIONS).
[There is a 4 ft. 6 in. (~137 cm) long by 2 in. (nominal) wide strip of hook-and-loop
tape (“loop” side) along the center of the DRIVER STATION support shelf that
should be used to secure the OPERATOR CONSOLE to the shelf. See Section
5.6.2 DRIVER STATIONS for details.
Please note that while there is no hard weight limit, OPERATOR CONSOLES that
weigh more than 30 lbs. (~13 kg.) will invite extra scrutiny as they are likely to
present unsafe circumstances.]

R905 *FIELD wireless only. Other than the system provided by the FIELD, no other form of wireless
communications shall be used to communicate to, from, or within the OPERATOR CONSOLE.
[Examples of prohibited wireless systems include, but are not limited to, active
wireless network cards and Bluetooth devices. For the case of the FIRST
Robotics Competition, a motion sensing input device (e.g. Microsoft Kinect) is
not considered wireless communication and is allowed.]

R906 *No unsafe OPERATOR CONSOLES. OPERATOR CONSOLES shall not be made using hazardous
materials, be unsafe, cause an unsafe condition, or interfere with other DRIVE TEAMS or the operation
of other ROBOTS.

2024 Controller Map

2024 ControllerMapv2 scaled2.png

Archives