2026:Controls: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
Line 37: Line 37:
== Not Started ==
== Not Started ==
<p>'''Design'''</p>
<p>'''Design'''</p>
* Overall size
* Research leather, LCD (touch screen? LED buttons?)
* Research leather, LCD (touch screen? LED buttons?)
* Lid: satchel latch (stationary/decor or functional)
* Lid: satchel latch (stationary/decor or functional)

Revision as of 14:29, 18 January 2026

Overall Concept

Design Idea: Satchel

IMG 3480.jpeg
IMG 3481.jpeg


Mock Up of Lid 'latch', using magnets (this worked well)

IMG 3518.jpeg
IMG 3519.jpeg
IMG 3520.jpeg

Design Info

Paint Scheme:

Overall Dimension: 23" by 13.75" without handle

Websites:

LOGO Customized Leather Stamp Handle ...

To - Do

THY CHILDREN TAKE Y'ALLS GAME AND TOOLS TEST EVERYDAY!!!

Not Started

Design

  • Research leather, LCD (touch screen? LED buttons?)
  • Lid: satchel latch (stationary/decor or functional)

CAD

  • Create a 1511 stamp (square backing dimensions: ) (1511 extruded dimensions: )
  • Create a lightning bolt stamp (circle backing dimensions: ) (lightning bolt extruded dimensions: )

CAD Assembly

Shop Drawings

Test Fitting

Final Assembly

Wiring

In Progress

Design

CAD

  • Research handles/straps

CAD Assembly

Shop Drawings

Test Fitting

Final Assembly

Wiring

Completed

Design

  • Added dinosaur font links to "Design Info" section
  • Added a YouTube link about how to stamp leather into the "Design Info" section
  • Added a picture of a stamp handle for an example into the "Design Info" section
  • Bring over files (2025 to 2026): Laptop holder, Controller holder, Ethernet, Bottom, Lid, Controller, Laptop, Magnet
  • Added a lego.com link for LEGO Bones to the "Design Info" section - Determined (if decided to use) 8 needed, purchase 10
  • Finalized design concept
  • Magnet mock up (lid)
  • Determined overall size (23" by 13.75" without handle)

CAD

CAD Assembly

Shop Drawings

Test Fitting

Final Assembly

Wiring

Meeting Minutes

1/10 (Sat)

Attendees: Sami, Clara, Byers, Eric

Work Completed:

  • Design concepts

1/11 (Sun)

Attendees: Sami, Byers

Work Completed:

  • Design concepts

1/14 (Wed)

Attendees: Clara, Sami, Byers

Work Completed:

  • Added dinosaur font links to "Design Info" section
  • Added a YouTube link about how to stamp leather into the "Design Info" section
  • Added a picture of a stamp handle for an example into the "Design Info" section
  • Added a lego.com link for LEGO Bones to the "Design Info" section - Determined (if decided to use) 8 needed, purchase 10
  • Started bringing over files (2025 to 2026): Laptop holder, Controller holder, Ethernet, Bottom, Lid, Controller, Laptop, Magnet

1/17 (Sat)

Attendees: Sami, Clara, Matias, Byers

Work Completed:

  • Finalized design concept
  • Magnet mock up (lid)
  • Brought over files from 2025 to 2026: Laptop holder, Controller holder, Ethernet, Bottom, Lid, Controller, Laptop, Magnet (NOTE: final assembly needs constraints re-done)
  • Researched handles/straps

1/18 (Sun)

Attendees: Sami, Byers, Eric

Work Completed:

  • Started CAD
  • Determined overall size (23" by 13.75" without handle)

1/20 (Tue)

Attendees:

Work Completed:


1/21 (Wed)

Attendees:

Work Completed:


1/22 (Thu)

Attendees:

Work Completed:


1/24 (Sat) V-CARVE WITH PIZZO

Attendees:

Work Completed:


1/25 (Sun)

Attendees:


Work Completed:

1/27 (Tue)

Attendees:

Work Completed:


1/28 (Wed)

Attendees:

Work Completed:


1/29 (Thu)

Attendees:

Work Completed:


1/31 (Sat)

Attendees:

Work Completed:


2/1 (Sun)

Attendees:

Work Completed:


2/3 (Tue)

Attendees:

Work Completed:


2/4 (Wed)

Attendees:

Work Completed:


2/5 (Thu)

Attendees:

Work Completed:


2/7 (Sat)

Attendees:

Work Completed:


2/8 (Sun)

Attendees:

Work Completed:


2/10 (Tue)

Attendees:

Work Completed:


2/11 (Wed)

Attendees:

Work Completed:


2/12 (Thu)

Attendees:

Work Completed:


2/14 (Sat)

Attendees:

Work Completed:


2/15 (Sun)

Attendees:

Work Completed:


2/17 (Tue)

Attendees:

Work Completed:


2/18 (Wed)

Attendees:

Work Completed:


2/19 (Thu)

Attendees:

Work Completed:

2/21 (Sat)

Attendees:

Work Completed:


2/22 (Sun)

Attendees:

Work Completed:


2/24 (Tue)

Attendees:

Work Completed:


2/25 (Wed)

Attendees:

Work Completed:


2/26 (Thu)

Attendees:

Work Completed:


2/28 (Sat)

Attendees:

Work Completed:

3/1 (Sun)

Attendees:

Work Completed:


3/3 (Tue)

Attendees:

Work Completed:


3/4 (Wed)

Attendees:

Work Completed:


3/5 (Thu)

Attendees:

Work Completed:


3/7 (Sat)

Attendees:

Work Completed:


3/8 (Sun)

Attendees:

Work Completed:

2026 Controller Map

Archives