2026:Controls: Difference between revisions
| Line 453: | Line 453: | ||
* Sami used the Mill to adjust LCD box | * Sami used the Mill to adjust LCD box | ||
* LCD Stuff | * LCD Stuff | ||
'''2/22 (Sun)''' | '''2/22 (Sun)''' | ||
Attendees: | Attendees: Sami, Byers, Eric | ||
Work Completed: | Work Completed: | ||
* Found a location for our repair kit for competition and posted it in teams | |||
'''2/24 (Tue)''' | '''2/24 (Tue)''' | ||
Revision as of 12:20, 22 February 2026
Overall Concept
Physical Box:
Design Idea: Satchel
|
|
Mock Up of Lid 'latch', using magnets (this worked well)
Stitching/Stamping
Design Info
Paint Scheme: Brown, Brass, Black
- P073 Controls Bottom: Brown
- P074 Controls Top: Brown
- P075 Angle - Rolling: Brown
- P076 Angle - LCD: Brown
- P077 Angle - Thunder: Brown
- P078 Angle - Magnets: Brown
- P079 Angle - Tiny: Brown
- P080 Laptop Holder: Black
- P081 Power and Ethernet: Brown
- P082 Controller Holder: Black ABS
- P083 Controller Holder 2: Black ABS
- P111 Controls Handle: Red Filament, Painted Black
Overall Dimension: 23" by 13.75" without handle
Patch Dimension: 2" by 3" with 0.2" Rivets
Leather is 2.0 MM Thick
1511 stamp (0.17"H by 0.366"W)
Lightning Bolt stamp (1.5" by 2.5")
Websites:
- fontspace.com: Dinosaur Font #1
- fontspace.com: Dinosaur Font #2
- fontspace.com: Dinosaur Font #3
- fontspace.com: Dinosaur Font #4
- youtube.com: How to Stamp Leather
- lego.com: LEGO Bone
- amazon.com: Handle Option #1
- amazon.com: Strap Option #1
- Strap Option #2
- LCD:
- touch LCD 4"
- spec for above
- another LCD
- knockoff Mega 2560
- Arduino Mega 2560
- Capacitive Touch <- using this one for 2026, with a Arduino Nano Every
- Thingaverse Bones:
- amazon.com: Rivets
- amazon.com: Rivets 2.0
- amazon.com: Buckle
- Bag Pouch/Handle
LCD Layout
To - Do
Sami:
- Tool Test (100%) & Game Test (100%)
- Used the Mill for the FIRST TIME 2/21/2026
Clara:
- Tool Test (100%)
- Artist (R - T - EAST)
Not Started
- Label Broken Switches
In Progress
- LCD Stuff
Completed
Design
- Added design pictures to the "Overall Concept" and the "Design Info" section
- Added links for fonts, videos, and bling to the "Design Info" section
- Brought over 2025 files to 2026: Laptop holder, Controller holder, Ethernet, Bottom, Lid, Controller, Laptop, Magnet
- Finalized design concept
- Magnet mock up (lid)
- Determined overall size (23" by 13.75" without handle)
- Added leather, magnets, sliding tape, power strip, handle, rivets, buckle strap, bag, LCD, LEDs, broken switches, power plug, Right Angle Ethernet, SD Card to shopping list
- Determined that latch is bling only and not functional
- Researched Thingaverse bones for 3-D printing
- Created a to scale lid on paper
- Found HUB, A to B USB Cable, USB for Arduino, Right Angle USB, PCB Board, Spade Connectors
CAD
- Fixed the 'G' in Rolling Thunder
- Added dinosaur footprints into bottom end
- Look at end
- Added holes for magnets and studs in the top
- Added holes for angle supports; in supports and bottom
- LCD: opening in bottom and PEM holes for mounting
- Finished remaining fillets on letters
- Added notches to angle pieces (so we can bend down later to help with lid insertion)
- Changed mounting holes on laptop holder to correct size
- Updated CAD for new controller holder mounting (NOTE: two holes in bottom do NOT get PEMS, like last year, see mini assembly)
- Changed 'DIVE' to '1511' on laptop holder (just for now, incase we don't have time to work on it)
- Assigned part numbers for all our items and updated the names in Onshape to match
- controller holders
- LCD opening and studs
- Created a 1511 stamp (0.17"H by 0.366"W)
- Created a lightning bolt stamp (1.5" by 2.5")
- Bottom: printed 2 copies of PDF and put in binder
- Power & Ethernet: printed 2 copies of PDF and put in binder
- Top: created drawing and approved, created flat pattern DXF and PDF, printed 2 copies of PDF and put in binder, posted DXF and PDF to Teams
- Changed one '1511' to a bone in the Laptop Holder
- Laptop Holder: created drawing and got approved, created a flat pattern DXF, PDF and STEP , posted DXF, PDF, STEP to teams, printed 2 copies of PDF and put in binder
- Angle - Tiny: created drawing and got approved, created a flat pattern DXF and PDF, posted DXF and PDF to teams, printed 2 copies of PDF and put in binder
- Angle - Rolling: created drawing and got approved, created a flat pattern DXF and PDF, posted DXF and PDF to teams, printed 2 copies of PDF and put in binder
- Angle - LCD: created drawing and got approved, created a flat pattern DXF and PDF, posted DXF and PDF to teams, printed 2 copies of PDF and put in binder
- Angle - Thunder: created drawing and got approved, created a flat pattern DXF and PDF, posted DXF and PDF to teams, printed 2 copies of PDF and put in binder
- Angle - Magnets: created drawing and got approved, created a flat pattern DXF and PDF, posted DXF and PDF to teams, printed 2 copies of PDF and put in binder
- Controller Holder: created drawing and got approved, printed 2 copies and put in binder, created STL and put in teams, updated parts and assembly log and 3D printed parts request
- Controller Holder 2 : created drawing and got approved, printed 2 copies and put in binder, created STL and put in teams, updated parts and assembly log and 3D printed parts request
- Control Handle: created drawing and got approved, printed 2 copies and put in the binder, created STL and put it in teams, updated parts and assembly log and 3D printed parts request
- LCD Cage: created drawing and got approved, created STL and put in teams, updated parts and assembly log and 3D printed parts request
CAD Assembly
- Constrained magnets in assembly and notched end angle support
- Created mini CAD assemblies, because we will need those for Harris Shop; included PEMs
- Confirmed steel for magnets on top will clear end
- Determined controller holder placement and mounting
Shop Drawings
- Created drawings for Bottom and Power/Ethernet
- Created a STEP oof Bottom
Test Fitting
- Test fitted rivets
Final Assembly
- Stamped/Etched Leather Pieces
- Finalized Paint Scheme
- Handle
- Cable Management
- Put in and tested magnets
Wiring
- Modified Broken Switches with Spade Connectors and tested
- Removed Cap from 2023 PCB Board
- Soldered LCD & Arduino headers onto PCB Board
- Made diagram
Meeting Minutes
1/10 (Sat)
Attendees: Sami, Clara, Byers, Eric
Work Completed:
- Design concepts
1/11 (Sun)
Attendees: Sami, Byers
Work Completed:
- Design concepts
1/14 (Wed)
Attendees: Sami, Clara, Byers
Work Completed:
- Added dinosaur font links to "Design Info" section
- Added a YouTube link about how to stamp leather into the "Design Info" section
- Added a picture of a stamp handle for an example into the "Design Info" section
- Added a lego.com link for LEGO Bones to the "Design Info" section - Determined (if decided to use) 8 needed, purchase 10
- Started bringing over files (2025 to 2026): Laptop holder, Controller holder, Ethernet, Bottom, Lid, Controller, Laptop, Magnet
1/17 (Sat)
Attendees: Sami, Clara, Matias, Byers
Work Completed:
- Finalized design concept
- Magnet mock up (lid)
- Brought over files from 2025 to 2026: Laptop holder, Controller holder, Ethernet, Bottom, Lid, Controller, Laptop, Magnet (NOTE: final assembly needs constraints re-done)
- Researched handles/straps
1/18 (Sun)
Attendees: Sami, Byers, Eric
Work Completed:
- Started CAD
- Determined overall size (23" by 13.75" without handle)
- Created sizing for stamps
- Added leather, magnets, sliding tape, and power strip on shopping list
- Researched LCDs and Arduinos
1/21 (Wed)
Attendees: Sami, Clara, Eric
Work Completed:
- Determined that latch is bling only and not functional
- Designed handle for lid... its a bag... (see updated picture)
- Figured out how to flange!!!
- Researched Thingaverse bones for 3-D printing
- Researched handle, rivets, clasp
1/22 (Thu)
Attendees: Sami, Clara, Byers
Work Completed:
- Change font for Rolling Thunder
- Determined offset of lid supports (aka Angle pieces) to top lip & fixed constraints
- adjusted lid support lengths and how much it goes into the box
- fixed laptop constraints in assembly
- Researched bags
1/24 (Sat) V-CARVE WITH PIZZO
Attendees: Sami, Clara, Byers, Eric
Work Completed:
- Added handle, rivets, buckle strap, and bag to shopping list
- Fixed the 'G' in Rolling Thunder
- Added dinosaur footprints into bottom end
- Created a to scale lid on paper
- CAD: added holes for magnets and studs in the top
- CAD: constrained magnets in assembly and notched end angle support
- CAD: did holes for angle supports; in supports and bottom
1/25 (Sun)
Attendees: Byers, Eric
Work Completed:
- Created mini CAD assemblies, because we will need those for Harris Shop; included PEMs
- picked LCD and put on shopping list
- CAD: LCD, opening in bottom and PEM holes for mounting (NOTE: will create 'cage' around LCD)
- confirmed steel for magnets on top will clear end
- finished remaining fillets on letters
- added notches to angle pieces, so we can bend down later to help with lid insertion
- made laptop holder mounting holes slightly bigger, to match other parts
- determined controller holder placement and mounting; updated CAD for new mounting (NOTE: two holes in bottom do NOT get PEMs, like last year, see mini assembly)
- change 'DIVE' to '1511' on laptop holder (just for now, incase we don't have time to work on it)
- assigned part numbers for all our items and updated the names in OnShape to match
- created drawings for Bottom and Power/Ethernet; create STEP of bottom
- reviewed drawings
1/26 (Mon)
Attendees: Byers
Work Completed:
- Assigned numbers for the Bottom and Top assemblies
- created drawing for Bottom Assembly
- created flat pattern files (i.e. DXF) for Bottom and Power/Ethernet
- created PDF files for Bottom, Power/Ethernet, and Bottom Assembly
- posted all 5 files to Teams
1/28 (Wed) V-CARVE WITH PIZZO (Lightning Bolt (Reverse) & 1511 (Reverse))
Attendees: Sami, Clara, Eric
Work Completed:
- Created a 1511 stamp (0.17"H by 0.366"W)
- Created a lightning bolt stamp (1.5" by 2.5")
- Bottom: printed 2 copies of PDF and put in binder
- Power & Ethernet: printed 2 copies of PDF and put in binder
- Top: created drawing and approved, created flat pattern DXF and PDF, printed 2 copies of PDF and put in binder, posted DXF and PDF to Teams
- Found a bone to put on the laptop holder.
1/29 (Thu)
Attendees: Sami, Clara, Byers
Work Completed:
- Changed one '1511' to a bone in the Laptop Holder
- Laptop Holder: created drawing and got approved, created a flat pattern DXF, PDF, and STEP, posted DXF, PDF, and STEP to teams, printed 2 copies of PDF and put in binder
- Angle - Tiny: created drawing and got approved, created a flat pattern DXF and PDF, posted DXF and PDF to teams, printed 2 copies of PDF and put in binder
- Angle - Rolling: created drawing and got approved, created a flat pattern DXF and PDF, posted DXF and PDF to teams, printed 2 copies of PDF and put in binder
- Added LEDs to shopping list
- Angle - LCD: created drawing and got approved, created a flat pattern DXF and PDF, posted DXF and PDF to teams, printed 2 copies of PDF and put in binder
- Angle - Thunder: created drawing and got approved, created a flat pattern DXF and PDF, posted DXF and PDF to teams, printed 2 copies of PDF and put in binder
- Angle - Magnets: created drawing and got approved, created a flat pattern DXF and PDF, posted DXF and PDF to teams, printed 2 copies of PDF and put in binder
1/31 (Sat)
Attendees: Sami, Eric, Byers
Work Completed:
- Controller Holder: created drawing and got approved, printed 2 copies and put in binder, created STL and put in teams, updated parts and assembly log and 3D printed parts request
- Controller Holder 2 : created drawing and got approved, printed 2 copies and put in binder, created STL and put in teams, updated parts and assembly log and 3D printed parts request
- Added broken switches to shopping list
- Found HUB, A to B USB Cable, USB for Arduino, Right Angle USB, PCB Board, Spade Connectors
- Ordered power plug, Right Angle Ethernet, SD Card
- Worked on Paint Scheme
- Modified Broken Switches with Spade Connectors and tested
- Removed Cap from 2023 PCB Board
2/1 (Sun)
Attendees: Sami, Clara, Byers
Work Completed:
- Soldered LCD & Arduino headers onto PCB Board
- Controls Handle: created drawing and got it approved, printed 2 copies and put in binder, created STL and put it in teams, updated parts and assembly log and 3D printed parts request
- Removed back straps in the leather pouch
- Cut PCB Board to length
- Tested stamps
- Made wire diagram
2/5 (Thu)
Attendees: Clara, Byers
Work Completed:
- started controller handle 3D print
- glued small piece of leather to aluminum with 5-minute epoxy as a test
- cleaned up controller holders and confirmed 6-32 screw fits in the holes
- changed out the VCC and GND wires on the proto board with a heavier gauge wire
2/7 (Sat)
Attendees: Sami, Clara, Byers, Eric
Work Completed:
- A lot of leather working
- Test fitted rivets
- A lot of electrical
- LCD Cage
- Tested lightning bolt stamp
- Made templates for leather
- Stamped/Etched Leather Pieces
- Finalized Paint Scheme
- Picked what Brown paint we will use
- submitted proto holder for 3D printing
2/8 (Sun)
Attendees: Byers
Work Completed:
- tested proto board
- added plastic and hit glue to proto board to protect it
- fitted proto holder
- started CAD for LCD Cage
2/11 (Wed)
Attendees: Sami, Clara, Eric
Work Completed:
- Test fitted most items and found hardware
- Countersunk three holes that needed them
- Bent all rails
2/12 (Thu)
Attendees: Sami, Clara, Byers
Work Completed:
- Filed sharp things
- Tested magnets; 2 are enough
- Tested Ethernet and power plug
- Modified magnets
- Confirmed LCD opening is good
2/13 (Fri)
Attendees: Byers
Work Completed:
- Finished LCD Cage 3D part
2/14 (Sat)
Attendees: Sami, Clara, Byers, Eric
Work Completed:
- Figured out spacing and drilled holes for leather handles
- Soldered wires to LED; tested LEDs
- Spray painted all parts that needed painting
- Hot glued magnets into place so they are centered
- LCD cage: print completed; tapped holes; mounted LCD; made USB cable hole bigger; test fitted to base
- Velcroed bottom, and cut pieces to length
- Found tape for LED strips
2/15 (Sun)
Attendees: Sami, Clara, Byers
Work Completed:
- finalized LCD graphic layout and put on wiki
- Glued leather onto top
- Taped bottom of rails
- Taped LEDs in
- Bolted controllers in
- Bolted laptop in
- Snapped in power and bolted in ethernet
- Velcroed power strip
- Broken switches (and board) Velcroed and tested
- Velcroed laptop tray
- Placed the right angle ethernet in bottom (no cable management has been completed)
- Velcroed controller holders
- Worked on and Talked through some LCD
2/18 (Wed)
Attendees: Sami, Clara
Work Completed:
- Completed Buttons (LCD Drawings)
- Put tape on top of rails
- Touched up top of top and resprayed bottom
2/19 (Thu)
Attendees: Sami, Clara, Byers
Work Completed:
- LCD Stuff
- Fixed top of Top
- Got handle onto bottom
2/21 (Sat)
Attendees: Sami, Clara, Byers
Work Completed:
- Cable Management
- Put in and tested magnets
- Changed what HUB we are using
- Updated Wiki to include pictures of the physical box!
- Sami used the Mill to adjust LCD box
- LCD Stuff
2/22 (Sun)
Attendees: Sami, Byers, Eric
Work Completed:
- Found a location for our repair kit for competition and posted it in teams
2/24 (Tue)
Attendees:
Work Completed:
2/25 (Wed)
Attendees:
Work Completed:
2/26 (Thu)
Attendees:
Work Completed:
2/28 (Sat)
Attendees:
Work Completed:
3/1 (Sun)
Attendees:
Work Completed:
3/3 (Tue)
Attendees:
Work Completed:
3/4 (Wed)
Attendees:
Work Completed:
3/5 (Thu)
Attendees:
Work Completed:
3/7 (Sat)
Attendees:
Work Completed:
3/8 (Sun)
Attendees:
Work Completed:
2026 Controller Map
Archives
- 2025:Controls
- 2024:Controls
- 2023:Controls
- 2022:Controls
- 2020:Controls
- 2019:Controls
- 2018:Controls
- 2017:Controls
- 2016:Controls
- 2015:Electrical_Controls_Subteam
- 2014:Electrical_Controls_Subteam
- 2013:Electrical_Controls_Subteam
- 2012:Electrical_Controls
- 2011:Electrical_Controls
- 2010:Electrical_Controls
- 2009:Electrical_Controls
