2026:Controls

From 1511Wookiee
Jump to navigationJump to search

Overall Concept

Design Idea: Satchel



Image.jpeg
 
IMG 3481.jpeg
 
Image 1.jpeg


Mock Up of Lid 'latch', using magnets (this worked well)

IMG 3518.jpeg
IMG 3519.jpeg
IMG 3520.jpeg

Stitching/Stamping

Screenshot 2026-01-18 200213.png
Screenshot 2026-01-18 201506.png

Design Info

Paint Scheme:

Overall Dimension: 23" by 13.75" without handle

Websites:


LOGO Customized Leather Stamp Handle ...

To - Do

THY CHILDREN TAKE Y'ALLS GAME AND TOOLS TEST EVERYDAY!!!

Not Started

Design

CAD

CAD Assembly

Shop Drawings

Test Fitting

Final Assembly

Wiring

In Progress

Design

  • LCD

CAD

  • Create a 1511 stamp (0.17"H by 0.366"W)
  • Create a lightning bolt stamp (2.75" by 2.75")

CAD Assembly

Shop Drawings

Test Fitting

Final Assembly

Wiring

Completed

Design

  • Added design pictures to the "Overall Concept" and the "Design Info" section
  • Added links for fonts, videos, and bling to the "Design Info" section
  • Brought over 2025 files to 2026: Laptop holder, Controller holder, Ethernet, Bottom, Lid, Controller, Laptop, Magnet
  • Finalized design concept
  • Magnet mock up (lid)
  • Determined overall size (23" by 13.75" without handle)
  • Added leather, magnets, sliding tape, power strip, handle, rivets, buckle strap, and bag to shopping list
  • Determined that latch is bling only and not functional
  • Researched Thingaverse bones for 3-D printing

CAD

CAD Assembly

Shop Drawings

Test Fitting

Final Assembly

Wiring

Meeting Minutes

1/10 (Sat)

Attendees: Sami, Clara, Byers, Eric

Work Completed:

  • Design concepts

1/11 (Sun)

Attendees: Sami, Byers

Work Completed:

  • Design concepts

1/14 (Wed)

Attendees: Sami, Clara, Byers

Work Completed:

  • Added dinosaur font links to "Design Info" section
  • Added a YouTube link about how to stamp leather into the "Design Info" section
  • Added a picture of a stamp handle for an example into the "Design Info" section
  • Added a lego.com link for LEGO Bones to the "Design Info" section - Determined (if decided to use) 8 needed, purchase 10
  • Started bringing over files (2025 to 2026): Laptop holder, Controller holder, Ethernet, Bottom, Lid, Controller, Laptop, Magnet

1/17 (Sat)

Attendees: Sami, Clara, Matias, Byers

Work Completed:

  • Finalized design concept
  • Magnet mock up (lid)
  • Brought over files from 2025 to 2026: Laptop holder, Controller holder, Ethernet, Bottom, Lid, Controller, Laptop, Magnet (NOTE: final assembly needs constraints re-done)
  • Researched handles/straps

1/18 (Sun)

Attendees: Sami, Byers, Eric

Work Completed:

  • Started CAD
  • Determined overall size (23" by 13.75" without handle)
  • Created sizing for stamps
  • Added leather, magnets, sliding tape, and power strip on shopping list
  • Researched LCDs and Arduinos

1/21 (Wed)

Attendees: Sami, Clara, Eric

Work Completed:

  • Determined that latch is bling only and not functional
  • Designed handle for lid... its a bag... (see updated picture)
  • Figured out how to flange!!!
  • Researched Thingaverse bones for 3-D printing
  • Researched handle, rivets, clasp

1/22 (Thu)

Attendees: Sami, Clara, Byers

Work Completed:

  • Change font for Rolling Thunder
  • Determined offset of lid supports (aka Angle pieces) to top lip & fixed constraints
  • adjusted lid support lengths and how much it goes into the box
  • fixed laptop constraints in assembly
  • Researched bags

1/24 (Sat) V-CARVE WITH PIZZO (Lightning Bolt (Reverse) & 1511 (Reverse))

Attendees: Sami, Clara, Byers, Eric

Work Completed:

  • Added handle, rivets, buckle strap, and bag to shopping list

1/25 (Sun)

Attendees:

Work Completed:

1/27 (Tue)

Attendees:

Work Completed:


1/28 (Wed)

Attendees:

Work Completed:


1/29 (Thu)

Attendees:

Work Completed:


1/31 (Sat) V-CARVE WITH PIZZO

Attendees:

Work Completed:


2/1 (Sun)

Attendees:

Work Completed:


2/3 (Tue)

Attendees:

Work Completed:


2/4 (Wed)

Attendees:

Work Completed:


2/5 (Thu)

Attendees:

Work Completed:


2/7 (Sat)

Attendees:

Work Completed:


2/8 (Sun)

Attendees:

Work Completed:


2/10 (Tue)

Attendees:

Work Completed:


2/11 (Wed)

Attendees:

Work Completed:


2/12 (Thu)

Attendees:

Work Completed:


2/14 (Sat)

Attendees:

Work Completed:


2/15 (Sun)

Attendees:

Work Completed:


2/17 (Tue)

Attendees:

Work Completed:


2/18 (Wed)

Attendees:

Work Completed:


2/19 (Thu)

Attendees:

Work Completed:

2/21 (Sat)

Attendees:

Work Completed:


2/22 (Sun)

Attendees:

Work Completed:


2/24 (Tue)

Attendees:

Work Completed:


2/25 (Wed)

Attendees:

Work Completed:


2/26 (Thu)

Attendees:

Work Completed:


2/28 (Sat)

Attendees:

Work Completed:

3/1 (Sun)

Attendees:

Work Completed:


3/3 (Tue)

Attendees:

Work Completed:


3/4 (Wed)

Attendees:

Work Completed:


3/5 (Thu)

Attendees:

Work Completed:


3/7 (Sat)

Attendees:

Work Completed:


3/8 (Sun)

Attendees:

Work Completed:

2026 Controller Map

Archives