2023:Controls

From 1511Wookiee
Jump to navigationJump to search

Overall Concept

Ideas

-9V Battery shape (1511 V)

-5 presets: (ground, 1st cube, 1st cone, 2nd cube, 2nd cone)

-Keep it short (because the scoring is in front of the table)

-Has a place to store the controllers

-All PlayStation controller

-Have wheels like last year?

-NO ZIPPERS

-No funny angles (unlike 2020)

-Cabinet like 2020

-Shapes on the sides that look like renewable energy sources (windmill, solar panel, etc.)

-Lightbulb/fan?

-"Radiation"

Image of a 9-Volt battery, annotated to show where features of the operator console would be
2023 controls idea 1






CAD model of a 9-Volt battery, annotated to show where features of the operator console would be
2023 controls idea 2







Design Info

41.25 inches tall maximum (Try to keep it shorter)

To Do

Not Started

In Process

Completed

Meeting Minutes

1/14

Attendees: Byers, Eric, Sam, Gabby, Sammy, Hailey, Tyler

Work Completed:

  • primed this Wiki page
  • Reviewed previous controllers for reference
  • Made some ideas for the 2023 controller
  • Voted on controller drawings
  • Made some measurements for controller dimensions

1/15

Attendees:

Work Completed:

1/17

Attendees:

Work Completed:

1/18

Attendees:

Work Completed:

1/19

Attendees:

Work Completed:

1/21

Attendees:

Work Completed:

1/22

Attendees:

Work Completed:

1/24

Attendees:

Work Completed:

1/25

Attendees:

Work Completed:

1/26

Attendees:

Work Completed:

1/28

Attendees:

Work Completed:

1/29

Attendees:

Work Completed:

1/31

Attendees:

Work Completed:

2/1

Attendees:

Work Completed:

2/2

Attendees:

Work Completed:

2/4

Attendees:

Work Completed:

2/5

Attendees:

Work Completed:

2/7

Attendees:

Work Completed:

2/8

Attendees:

Work Completed:

2/9

Attendees:

Work Completed:

2/11

Attendees:

Work Completed:

2/12

Attendees:

Work Completed:

2/14

Attendees:

Work Completed:

2/15

Attendees:

Work Completed:

2/16

Attendees:

Work Completed:

2/18

Attendees:

Work Completed:

2/19

Attendees:

Work Completed:

2/21

Attendees:

Work Completed:

2/22

Attendees:

Work Completed:

2/23

Attendees:

Work Completed:

2/25

Attendees:

Work Completed:

2/26

Attendees:

Work Completed:

2/28

Attendees:

Work Completed:

3/1

Attendees:

Work Completed:

3/2

Attendees:

Work Completed:

3/4

Attendees:

Work Completed:

3/5

Attendees:

Work Completed:

3/7

Attendees:

Work Completed:

3/8

Attendees:

Work Completed:

3/9

Attendees:

Work Completed:

3/11

Attendees:

Work Completed:

3/12

Attendees:

Work Completed:

3/14

Attendees:

Work Completed:

Archives