2026:Controls
Overall Concept
Design Idea: Satchel
|
|
Mock Up of Lid 'latch', using magnets (this worked well)
Stitching/Stamping
Design Info
Paint Scheme:
Overall Dimension: 23" by 13.75" without handle
Websites:
- fontspace.com: Dinosaur Font #1
- fontspace.com: Dinosaur Font #2
- fontspace.com: Dinosaur Font #3
- fontspace.com: Dinosaur Font #4
- youtube.com: How to Stamp Leather
- lego.com: LEGO Bone
- amazon.com: Handle Option #1
- amazon.com: Strap Option #1
- Strap Option #2
- LCD:
- Thingaverse Bones:
- amazon.com: Rivets
- amazon.com: Rivets 2.0
- amazon.com: Buckle
- Bag Pouch/Handle
- Option #1
- Option #2
- Option #3
- Leather is 2.0 MM Thick
To - Do
THY CHILDREN TAKE Y'ALLS GAME AND TOOLS TEST EVERYDAY!!!
Not Started
Design
CAD
CAD Assembly
Shop Drawings
Test Fitting
Final Assembly
Wiring
In Progress
Design
- LCD
- Research handle/rivets/clasp/bag
CAD
- Create a 1511 stamp (0.12"H by 0.366"W)
- Create a lightning bolt stamp (2.75" by 2.75")
CAD Assembly
Shop Drawings
Test Fitting
Final Assembly
Wiring
Completed
Design
- Added dinosaur font links to "Design Info" section
- Added a YouTube link about how to stamp leather into the "Design Info" section
- Added a picture of a stamp handle for an example into the "Design Info" section
- Bring over files (2025 to 2026): Laptop holder, Controller holder, Ethernet, Bottom, Lid, Controller, Laptop, Magnet
- Added a lego.com link for LEGO Bones to the "Design Info" section - Determined (if decided to use) 8 needed, purchase 10
- Finalized design concept
- Magnet mock up (lid)
- Determined overall size (23" by 13.75" without handle)
- Added leather, magnets, sliding tape, and power strip on shopping list
- Determined that latch is bling only and not functional
- Researched Thingaverse bones for 3-D printing
- Researched bags
CAD
CAD Assembly
Shop Drawings
Test Fitting
Final Assembly
Wiring
Meeting Minutes
1/10 (Sat)
Attendees: Sami, Clara, Byers, Eric
Work Completed:
- Design concepts
1/11 (Sun)
Attendees: Sami, Byers
Work Completed:
- Design concepts
1/14 (Wed)
Attendees: Sami, Clara, Byers
Work Completed:
- Added dinosaur font links to "Design Info" section
- Added a YouTube link about how to stamp leather into the "Design Info" section
- Added a picture of a stamp handle for an example into the "Design Info" section
- Added a lego.com link for LEGO Bones to the "Design Info" section - Determined (if decided to use) 8 needed, purchase 10
- Started bringing over files (2025 to 2026): Laptop holder, Controller holder, Ethernet, Bottom, Lid, Controller, Laptop, Magnet
1/17 (Sat)
Attendees: Sami, Clara, Matias, Byers
Work Completed:
- Finalized design concept
- Magnet mock up (lid)
- Brought over files from 2025 to 2026: Laptop holder, Controller holder, Ethernet, Bottom, Lid, Controller, Laptop, Magnet (NOTE: final assembly needs constraints re-done)
- Researched handles/straps
1/18 (Sun)
Attendees: Sami, Byers, Eric
Work Completed:
- Started CAD
- Determined overall size (23" by 13.75" without handle)
- Created sizing for stamps
- Added leather, magnets, sliding tape, and power strip on shopping list
- Researched LCDs and Arduinos
1/21 (Wed)
Attendees: Sami, Clara, Eric
Work Completed:
- Determined that latch is bling only and not functional
- Designed handle for lid... its a bag... (see updated picture)
- Figured out how to flange!!!
- Researched Thingaverse bones for 3-D printing
- Researched handle, rivets, clasp
1/22 (Thu)
Attendees: Sami, Clara, Byers
Work Completed:
- Change font for Rolling Thunder
- Determined offset of lid supports (aka Angle pieces) to top lip & fixed constraints
- adjusted lid support lengths and how much it goes into the box
- fixed laptop constraints in assembly
- Researched bags
1/24 (Sat) V-CARVE WITH PIZZO (Lightning Bolt (Reverse) & 1511 (Reverse))
Attendees: Sami, Clara, Byers, Eric
Work Completed:
1/25 (Sun)
Attendees:
Work Completed:
1/27 (Tue)
Attendees:
Work Completed:
1/28 (Wed)
Attendees:
Work Completed:
1/29 (Thu)
Attendees:
Work Completed:
1/31 (Sat) V-CARVE WITH PIZZO
Attendees:
Work Completed:
2/1 (Sun)
Attendees:
Work Completed:
2/3 (Tue)
Attendees:
Work Completed:
2/4 (Wed)
Attendees:
Work Completed:
2/5 (Thu)
Attendees:
Work Completed:
2/7 (Sat)
Attendees:
Work Completed:
2/8 (Sun)
Attendees:
Work Completed:
2/10 (Tue)
Attendees:
Work Completed:
2/11 (Wed)
Attendees:
Work Completed:
2/12 (Thu)
Attendees:
Work Completed:
2/14 (Sat)
Attendees:
Work Completed:
2/15 (Sun)
Attendees:
Work Completed:
2/17 (Tue)
Attendees:
Work Completed:
2/18 (Wed)
Attendees:
Work Completed:
2/19 (Thu)
Attendees:
Work Completed:
2/21 (Sat)
Attendees:
Work Completed:
2/22 (Sun)
Attendees:
Work Completed:
2/24 (Tue)
Attendees:
Work Completed:
2/25 (Wed)
Attendees:
Work Completed:
2/26 (Thu)
Attendees:
Work Completed:
2/28 (Sat)
Attendees:
Work Completed:
3/1 (Sun)
Attendees:
Work Completed:
3/3 (Tue)
Attendees:
Work Completed:
3/4 (Wed)
Attendees:
Work Completed:
3/5 (Thu)
Attendees:
Work Completed:
3/7 (Sat)
Attendees:
Work Completed:
3/8 (Sun)
Attendees:
Work Completed:
2026 Controller Map
Archives
- 2025:Controls
- 2024:Controls
- 2023:Controls
- 2022:Controls
- 2020:Controls
- 2019:Controls
- 2018:Controls
- 2017:Controls
- 2016:Controls
- 2015:Electrical_Controls_Subteam
- 2014:Electrical_Controls_Subteam
- 2013:Electrical_Controls_Subteam
- 2012:Electrical_Controls
- 2011:Electrical_Controls
- 2010:Electrical_Controls
- 2009:Electrical_Controls