2009:Mechanical 3.1.2009
Progress update 3-1-09
Meet from noon till 5:00pm. Heard some folks came at 11:00 or 11:30 and then went home - sorry we were not clear.
Completed the shaft master layout templates for spacing, helix type and dounuts. Then completed F2 (front second level) and it looks great. Cuylar and Shanna did prep work on the others (drilling, precutting plucker tubes, preping the 10-32 screw sections, etc).
The matched set of 9 long front belts were made. The rear are almost complete - 3 more to do. We should think about spares? We have the older style front belts that we can cut and 2 piece them together for spares (2 each?)
Alex worked on a plexi chain guard - Not sure which location (upper shooter?)
Mike Wolf / Tom K - requester some eye bolt hardware for cable braces / ball containment) - Tom C. will pick up at H-Depot.
To Do List - Next Mtg 3-2-09 (5:30 - 7:30 or 8:00)
1. Finish R2
2. Finish F4 (top) and F3 (idler)
3. Finish R3 (top)