2013 ControlsToDoList

From 1511Wookiee
Revision as of 11:31, 9 February 2013 by ElectricalControls (talk | contribs)
Jump to navigationJump to search

This is a list of things that need to be done to complete the operator controls when the metalwork arrives. This list should be executed in order (1, 2, 3...) so that the controls are assembled correctly.

Drill mounting holes for various control functions.

         - Joysticks
         - eStop Control Board (under the right-side panel)
         - Cabinet Latches

Tap the holes for the eStop control board, cabinet latches, and PC stand. Install the two top panels using the hinges. The hinges should be riveted to the panels. Paint all of the pieces. Install the handles on the end of the controls. Install the cabinet latches and verify that they work. Mount the eStop Control Board. Mount the joysticks. Make sure to use lock washers. Mount the USB HUB. Mount the RJ45 connector. Install the broken pushbuttons and sliders. Put Velcro on the top of the laptop mount and the bottom of the laptop. Wire the controls

         - The two driver joysticks go to the USB HUB.
         - Broken buttons and sliders to the eStop control board.
         - eStop control board and secondary Joystick to the laptop right side.
         - USB HUB to the left side of the laptop.
         - RJ45 connector to the laptop RJ45 connector.

Verify that the controls work. Label the control functions.

Return to Main Page