2009:Drivetrain

From 1511Wookiee
Jump to navigationJump to search

Drivetrain Master Task List

1. Complete Bill of Materials (Need to post BOM, should be complete -JSG 2/02)

2. Fix Rubbing Issue on Mock Drivetrain

3. Make Bumpers (partially complete. May need fabric? -JSG 2/02)

4.Reassemble Drivetrain when parts return from Powdercoating

5. Design Mouse Sensor Mount (in progress parts to be ordered by 2/04 -JSG 2/02)

6. Assemble Camera Structure

7. Design & Build Camera Mount

Drivetrain Subteam's Engineering Notebook

Week 1 - 42 Days Left!!

Drivetrain 1.6.2009

Drivetrain 1.7.2009

Drivetrain 1.8.2009

Drivetrain 1.10.2009

Drivetrain 1.11.2009

Week 2 - 35 Days Left!!

Drivetrain 1.13.2009

Drivetrain 1.14.2009

Drivetrain 1.15.2009

Drivetrain 1.17.2009

Drivetrain 1.18.2009

Week 3 - 28 Days Left!!

Drivetrain 1.20.2009

Drivetrain 1.21.2009

Drivetrain 1.22.2009

Drivetrain 1.24.2009

Drivetrain 1.25.2009

Week 4 - 21 Days Left!!

Drivetrain 1.27.2009

Drivetrain 1.28.2009

Drivetrain 1.29.2009

Drivetrain 1.31.2009

Drivetrain 2.1.2009

Week 5 - 14 Days Left!!

Drivetrain 2.3.2009

Drivetrain 2.4.2009

Drivetrain 2.5.2009

Drivetrain 2.7.2009

Drivetrain 2.8.2009


Please Label All Notebook Pages Drivetrain X.XX.2009 to avoid confusion.