2009:Drivetrain 1.14.2009

From 1511Wookiee
Jump to navigationJump to search

1.14.2009

Start time: 6:30

End time: 9:00

Members present: Larry, Josh, ToNy


Tasks Completed:

  • Update the wiki for the last two sessions
  • Finish mounting the trailer hitch.
  • Finalize bumper mounting technique.



Tasks In Progress:

  • determin rear length
    • Build up bumpers.



Tasks to Complete:

  • Build up new frame to use while other is out being powder coated


New Frame Dimensions:

  • 30" C-Frame
  • 13" Transmission panels
  • 2 1/4" C-Frame to 1st set
  • 4 5/8" C-Frame to 2nd set
  • 5/8" 1st set from edge
  • 2/8" 2nd set from edge



Images & Additional Updates:

Drivetrain 1-14-2009.JPGUntitled.JPG


(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)