2009:Controls13109

From 1511Wookiee
Revision as of 13:29, 14 November 2010 by Heydowns (talk | contribs) (Controls13109 moved to 2009:Controls13109)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Date: 1/31/09

Start Time: 11:00 AM

End Time: 9:30 PM

Members Present: Nick, Alex, (Eric), (Victor)

Tasks Completed:

1. Incorporated D-rings, latches, and sliders into main control box.

2. Started to assemble secondary controls onto mock control board.

Tasks to Complete:

1. Finalize sheet metal modeling