== Master To-Do List before Regionals<br> ==
== Master To-Do List before Regionals<br> ==


Things To Do (in no particular order):  
Things To Do (in no particular order):  
Line 6: Line 6:
#<strike>Remove cable assemblies from batteries. *All 2009 batteries have been disassembled. The connectors and pig-tails are separate. Pigtails weigh .94 lbs.* Reassemble at competitions</strike>
#<strike>Remove cable assemblies from batteries. *All 2009 batteries have been disassembled. The connectors and pig-tails are separate. Pigtails weigh .94 lbs.* Reassemble at competitions</strike>


<font color="#00ff00" size="5">Batteries are allowed into competition fully put together thanks to a new FIRST update.</font><br><br>
<font size="5" color="#00ff00">Batteries are allowed into competition fully put together thanks to a new FIRST update.</font><br><br>  


#Drill mounting holes in spare mouse?  
#Drill mounting holes in spare mouse?  
Line 15: Line 15:
<br>[[Things to Take to Competitions|List of Things to Take to the Competitions]]  
<br>[[Things to Take to Competitions|List of Things to Take to the Competitions]]  


&nbsp;
&nbsp;  


== Electrical Main Subteam's Engineering Notebook  ==
== Electrical Main Subteam's Engineering Notebook  ==
Line 113: Line 113:
[[2009:Mouse details|Mouse Details|]]  
[[2009:Mouse details|Mouse Details|]]  


[[2009:Breaker Information|Breaker Information]]<br>
[[2009:Breaker Information|Breaker Information]]<br>  


== Links to Other Subteams' Important Stuff  ==
== Links to Other Subteams' Important Stuff  ==
Line 123: Line 123:
== '''<u>Electrical Fun</u>'''  ==
== '''<u>Electrical Fun</u>'''  ==


[http://rollingthunder.smugmug.com/gallery/4284920_s4NWg#254727854_sMXFx-A-LB <span style="text-decoration: underline;">Apples to Apples</span>]
[http://rollingthunder.smugmug.com/gallery/4284920_s4NWg#254727854_sMXFx-A-LB <span style="text-decoration: underline;">Apples to Apples</span>]  


= [[Image:Kirby.jpg]]<span style="background-color: rgb(0, 0, 0);"><span style="color: rgb(255, 153, 204);">HIIIIIIIIIIIIIII!!!</span></span>  =
= [[Image:Kirby.jpg]]<span style="background-color: rgb(0, 0, 0);"><span style="color: rgb(255, 153, 204);">HIIIIIIIIIIIIIII!!!</span></span>  =

Revision as of 19:18, 12 January 2010

Master To-Do List before Regionals

Things To Do (in no particular order):

  1. Update Bill of Material.
  2. Remove cable assemblies from batteries. *All 2009 batteries have been disassembled. The connectors and pig-tails are separate. Pigtails weigh .94 lbs.* Reassemble at competitions

Batteries are allowed into competition fully put together thanks to a new FIRST update.

  1. Drill mounting holes in spare mouse?
  2. Order any spare parts we need.
  3. figure out how to add conveyor shaft encoders (one on front conveyor, one on rear conveyor). 2009:New Sensor Mounting Ideas
  4. UPDATE our Electrical System Summary spreadsheet with the changes made at FLR.


List of Things to Take to the Competitions

 

Electrical Main Subteam's Engineering Notebook

Week 1 - 42 Days Left !

Electrical Main - 1.06.09
Electrical Main - 1.07.09
Electrical Main - 1.08.09
Electrical Main - 1.10.09

Electrical Main - 1.11.09

Week 2 -35 Days Left !!
Electrical Main - 1.13.09
Electrical Main - 1.14.09
Electrical Main - 1.15.09

Electrical Main - 1.17.09

Electrical Main - 1.18.09

Week 3 - 28 Days Left !!!

Electrical Main - 1.20.09

Electrical Main - 1.21.09

Electrical Main - 1.22.09

Electrical Main - 1.24.09

Electrical Main - 1.25.09

Week 4 - 21 Days Left !!!!

Electrical Main 1.27.09

Electrical Main 1.28.09

Electrical Main 1.29.09

Electrical Main 1.31.09

Electrical Main 2.1.09

Week 5 - 14 Days Left !!!!!

Electrical Main 2.3.09

Electrical Main 2.4.09

Electrical Main 2.5.09

Electrical Main 2.7.09

Electrical Main 2.8.09

Week 6 - 7 Days Left !!!!!!

Electrical Main 2.9.09

Electrical Main 2.10.09

Electrical Main 2.11.09

Electrical Main 2.12.09

Electrical Main 2.13.09

Electrical Main 2.14.09

Electrical Main 2.15.09



Component/Component Specifications

Electrical System Summary

Jaguar Speed Controllers

Victor 884 Speed Controllers

2009 KOP Motors Spreadsheet (Chief Delphi)

Motor Characteristics

Sensors

Servos

Micro Switches

Inventory

Electrical Board Inventor

Electrical Board Cover Inventor

Mouse Details|

Breaker Information

Links to Other Subteams' Important Stuff

IO_Map


Electrical Fun

Apples to Apples

Kirby.jpgHIIIIIIIIIIIIIII!!!


Please Label All Notebook Pages Electrical Main X.XX.2009 to avoid confusion.