2009:Electrical Main 2.14.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 25: Line 25:


*neaten up and label robot wiring  
*neaten up and label robot wiring  
*watch robot converyor belts fall off.
*watch robot conveyor belts fall off.


<br>
<br>

Revision as of 05:40, 16 February 2009


02.14.2009

Start time: 10:00

End time:

Members present:  Mike H., Rika, Crystal, Sean, Collin, Dave B, Victor, Dave S.


Tasks Completed:

  • Shortened up PWM cables on the robot.
  • Mounted electrical board cover
  • Mounted upper spinner shaft encoder
  • Rika finished 3rd spare mouse board



Tasks In Progress:

  • neaten up and label robot wiring
  • watch robot conveyor belts fall off.



Tasks to Complete:

  • task
  • task