2009:Integration 1.15.2009

From 1511Wookiee
Revision as of 11:11, 17 January 2009 by Mechanical1 (talk | contribs) (New page: <u>'''Integration Meeting Notes – 1/15/09'''</u> <br> <u>Mechanical 2:</u><br>Working on Frame Design <br><u>Programming:</u><br>May want a traction wheel to measure start/stop distan...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Integration Meeting Notes – 1/15/09


Mechanical 2:
Working on Frame Design


Programming:
May want a traction wheel to measure start/stop distance

Needs

Assembly of ball manipulation in Inventor – Mech 2 Needs from Mech 1


Space for electrical – still needs to be done – DUE TONIGHT
Available space & Dimensions needed from Inventor Mock Up – Not done Need Sunday
What Sensors are Needed – incomplete, in progress, DUE 18th
Need overall design of ball manipulator to determine sensors –
Trap Doors Defined – DUE 18th
Need Control Box I/O – Not done (next week ok 21stish)
Programming to determine if encoder wheel needed – Due Sat
Drivetrain needs help porting ProE into Inventor – Due