2009:Mechanical 1 - 1.11.09

From 1511Wookiee
Revision as of 14:38, 11 January 2009 by Mechanical1 (talk | contribs)
Jump to navigationJump to search

1. Alex Wolf, Mike Wolf, Dave Vadas, Alex Vadas, Mike M, Josh Goodman

2. 1/11/2009 10:30-5:00

3. Conveyor prototype refinment and weaknesses identified, component design in Inventor,  manufacturing techniques studied and component selection started

 4. Finish conveyor component design.  Need frame details from Mech2

5.

 Pulley 1-11-2009.jpg

End cap 1-11-2009 rend.jpgTube roller 1-11-2009.jpgFile:Pulley 1-11-2009