1.8.2009

Start time: 6:30pm

End time: 9:00pm

Members present: [Josh Goodman, Alex Wolf, Alex Vadas] - [Mike Wolf, Dave Vadas]


Tasks completed: 

- Finalized basic design

- Prototyped more in depth gatherer. Double "fingers" to gather the balls from both the hopper and the floor to shoot up into the conveyor. Again, surpassed expectations and worked very well.

- Looked at the possibility of using the fingers as a shooter with deflector as welll


Tasks to complete:


-Incorporate dimensions into the design

-Work on inventor