2009:Mechanical 2.28.2009: Difference between revisions
Drivetrain (talk | contribs) (New page: = Summary from 2-26-09 = Set out to prove out the add on helix idea for the shaft rollers. Used a PVC roller and set it up with 2 round belts with helix winds on both sides of the b...) |
Drivetrain (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
= Summary from 2-26-09 = | = Summary from 2-26-09 = | ||
Set out to prove out the add on helix idea for the shaft rollers. Used a PVC roller and set it up with 2 round belts with helix winds on both sides of the belts. Used our wooden mock up with a std plucker pulley shaft on the bottom. The concept worked great, it could feed balls up and feed them out the top. We used a stationary piece of wood board for the rear section. The helix sections would resote a belt that is pushed out of the desired tracking groove. There is a short video that Cynette took and it is placed on the conveyer redesign comments link near the 2-16-09 work sheet day log. | Set out to prove out the add on helix idea for the shaft rollers. Used a PVC roller and set it up with 2 round belts with helix winds on both sides of the belts. Used our wooden mock up with a std plucker pulley shaft on the bottom. The concept worked great, it could feed balls up and feed them out the top. We used a stationary piece of wood board for the rear section. The helix sections would resote a belt that is pushed out of the desired tracking groove. There is a short video that Cynette took and it is placed on the conveyer redesign comments link near the 2-16-09 work sheet day log. | ||
Started fab on 1/2" diameter shaft lengths and 1 1/2" diameter tube lengths. Also started cutting the nylon end plug bushings. Gathered up 1/2" shaft collars in case we need them. Goal would be to make 5 sets of these roller shafts. Should also make a spare as well. | |||
Spent time recalculating belt lengths to reduce the bearing loads and motor torque. Looking at 5 to 7% stretch. | |||
= Summary from Saturday 2-28-09 = | |||
Still concerned about |
Revision as of 18:46, 1 March 2009
Summary from 2-26-09
Set out to prove out the add on helix idea for the shaft rollers. Used a PVC roller and set it up with 2 round belts with helix winds on both sides of the belts. Used our wooden mock up with a std plucker pulley shaft on the bottom. The concept worked great, it could feed balls up and feed them out the top. We used a stationary piece of wood board for the rear section. The helix sections would resote a belt that is pushed out of the desired tracking groove. There is a short video that Cynette took and it is placed on the conveyer redesign comments link near the 2-16-09 work sheet day log.
Started fab on 1/2" diameter shaft lengths and 1 1/2" diameter tube lengths. Also started cutting the nylon end plug bushings. Gathered up 1/2" shaft collars in case we need them. Goal would be to make 5 sets of these roller shafts. Should also make a spare as well.
Spent time recalculating belt lengths to reduce the bearing loads and motor torque. Looking at 5 to 7% stretch.
Summary from Saturday 2-28-09
Still concerned about