2009:Mechanical 2 - 1.06.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: '''1.06.2009''' '''Start time:''' 6:30pm '''End time:''' 9:00pm '''Members present:''' [Cuyler McChesney, Kyle Schuhart, Shanali Weerasinghe, Kristina Kohl] - [Tom Kanzler, Tony Dal San...)
 
 
(4 intermediate revisions by 3 users not shown)
Line 1: Line 1:
'''1.06.2009'''
'''1.06.2009'''  


'''Start time:''' 6:30pm
'''Start time:''' 6:30pm  


'''End time:''' 9:00pm
'''End time:''' 9:00pm  


'''Members present:''' [Cuyler McChesney, Kyle Schuhart, Shanali Weerasinghe, Kristina Kohl] - [Tom Kanzler, Tony Dal Santo, Tom Cavaliere]
'''Members present:''' [Cuyler McChesney, Kyle Schuhart, Shanali Weerasinghe, Kristina Kohl] - [Tom Kanzler, Tony Dal Santo, Tom Cavaliere]  


<br>


----
----


'''Tasks completed:''' 
'''Tasks completed:'''   


- Worked with Drive Train to conclude a wide drive base with offset wheels
- Worked with Drive Train to conclude a wide drive base with offset wheels  


- Designed the robot based off robot design #4. It consists of a roller bringing balls into a 1x3 hopper (holds about 20 balls). There is a conveyor system in the front which bring the balls up to a top with a roller kicker to knock it out the front. The robot can only dump to the front. The reason for this is ease for the drivers being that you can just run towards a robot rather then precisely parking sideways.
- Designed the robot based off robot design #4. It consists of a roller bringing balls into a 1x3 hopper (holds about 20 balls). There is a conveyor system in the front which bring the balls up to a top with a roller kicker to knock it out the front. The robot can only dump to the front. The reason for this is ease for the drivers being that you can just run towards a robot rather then precisely parking sideways.  


- Created group difference. Mech 1 will start prototyping conveyor belts and rollers. Mech 2 will start looking at available space.
- Created group difference. Mech 1 will start prototyping conveyor belts and rollers. Mech 2 will start looking at available space.  


<br>


----
----


'''Tasks to complete:'''
'''Tasks to complete:'''  


<br> - Prototype systems


- Prototype systems
- Find available space and start laying out Inventor design


- Find available space and start laying out Inventor design
----
 
[[Mechanical_2|Mechanical 2 Main Page]]

Latest revision as of 14:38, 14 November 2010

1.06.2009

Start time: 6:30pm

End time: 9:00pm

Members present: [Cuyler McChesney, Kyle Schuhart, Shanali Weerasinghe, Kristina Kohl] - [Tom Kanzler, Tony Dal Santo, Tom Cavaliere]



Tasks completed: 

- Worked with Drive Train to conclude a wide drive base with offset wheels

- Designed the robot based off robot design #4. It consists of a roller bringing balls into a 1x3 hopper (holds about 20 balls). There is a conveyor system in the front which bring the balls up to a top with a roller kicker to knock it out the front. The robot can only dump to the front. The reason for this is ease for the drivers being that you can just run towards a robot rather then precisely parking sideways.

- Created group difference. Mech 1 will start prototyping conveyor belts and rollers. Mech 2 will start looking at available space.



Tasks to complete:


- Prototype systems

- Find available space and start laying out Inventor design


Mechanical 2 Main Page