2009:Mechanical 3.1.2009: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: = Progress update 3-1-09 = Meet from noon till 5:00pm.  Heard some folks came at 11:00 or 11:30 and then went home - sorry we were not clear. Completed the shaft master layout templ...)
 
No edit summary
Line 1: Line 1:
= Progress update 3-1-09 =
= Progress update 3-1-09 =


Meet from noon till 5:00pm.  Heard some folks came at 11:00 or 11:30 and then went home - sorry we were not clear.
Meet from noon till 5:00pm.  Heard some folks came at 11:00 or 11:30 and then went home - sorry we were not clear.  


Completed the shaft master layout templates for spacing, helix type and dounuts.  Then completed F2 (front second level) and it looks great.  Cuylar and Shanna did prep work on the others (drilling, precutting plucker tubes, preping the 10-32 screw sections, etc).    
Completed the shaft master layout templates for spacing, helix type and dounuts.  Then completed F2 (front second level) and it looks great.  Weight with collars just under 1 1/4 lbs. 
 
Cuylar and Shanna did prep work on the others (drilling, precutting plucker tubes, preping the 10-32 screw sections, etc).    


The matched set of 9 long front belts were made.  The rear are almost complete - 3 more to do.  We should think about spares?  We have the older style front belts that we can cut and 2 piece them together for spares (2 each?)   
The matched set of 9 long front belts were made.  The rear are almost complete - 3 more to do.  We should think about spares?  We have the older style front belts that we can cut and 2 piece them together for spares (2 each?)   


Alex worked on a plexi chain guard - Not sure which location (upper shooter?)
Alex worked on a plexi chain guard - Not sure which location (upper shooter?)  
 
Mike Wolf / Tom K - requester some eye bolt hardware for cable braces / ball containment)  - Tom C. will pick up at H-Depot.
 
= To Do List - Next Mtg 3-2-09 (5:30 - 7:30 or 8:00)  =


Mike Wolf / Tom K - requester some eye bolt hardware for cable braces / ball containment)  - Tom C. will pick up at H-Depot.
1.&nbsp; Finish R2 and R3 (top)shaft rollers - making dounuts and winding helix<br>


= To Do List - Next Mtg 3-2-09 (5:30 - 7:30 or 8:00) =
2.&nbsp; Finish F4 (top) and F3 (idler) rollers- making dounuts and winding helix<br>


1.&nbsp; Finish R2
3.&nbsp; Make the two spare nylon bushings (lathe work)


2.&nbsp; Finish F4 (top) and F3 (idler)
4.&nbsp; Make 3 more rear upper belts to complete the 9 piece matched set.


3.&nbsp; Finish R3 (top)
5.&nbsp;

Revision as of 19:43, 1 March 2009

Progress update 3-1-09

Meet from noon till 5:00pm.  Heard some folks came at 11:00 or 11:30 and then went home - sorry we were not clear.

Completed the shaft master layout templates for spacing, helix type and dounuts.  Then completed F2 (front second level) and it looks great.  Weight with collars just under 1 1/4 lbs. 

Cuylar and Shanna did prep work on the others (drilling, precutting plucker tubes, preping the 10-32 screw sections, etc).  

The matched set of 9 long front belts were made.  The rear are almost complete - 3 more to do.  We should think about spares?  We have the older style front belts that we can cut and 2 piece them together for spares (2 each?) 

Alex worked on a plexi chain guard - Not sure which location (upper shooter?)

Mike Wolf / Tom K - requester some eye bolt hardware for cable braces / ball containment)  - Tom C. will pick up at H-Depot.

To Do List - Next Mtg 3-2-09 (5:30 - 7:30 or 8:00)

1.  Finish R2 and R3 (top)shaft rollers - making dounuts and winding helix

2.  Finish F4 (top) and F3 (idler) rollers- making dounuts and winding helix

3.  Make the two spare nylon bushings (lathe work)

4.  Make 3 more rear upper belts to complete the 9 piece matched set.

5.