2010:Drivetrain: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 44: Line 44:
<u>'''*Work with Mech team to integrate beater bar. Front must remain stiff after c-channel is removed'''</u>  
<u>'''*Work with Mech team to integrate beater bar. Front must remain stiff after c-channel is removed'''</u>  


*****************************************<br>  
*****************************************<br>


COMPILE [http://penfieldrobotics.com/wiki/index.php?title=Integration_Status#Bill_of_Materials Bill of Materials]<br> <br> * Drive Train Parts To Be Ordered  
COMPILE [http://penfieldrobotics.com/wiki/index.php?title=Integration_Status#Bill_of_Materials Bill of Materials]<br> <br> * Drive Train Parts To Be Ordered  
Line 59: Line 59:
*Build Bumpers  
*Build Bumpers  
*Bumber mounts  
*Bumber mounts  
*Build gear boxxes
*<strike>Build gear boxxes</strike>
*<strike>Build wheels</strike>
*<strike>mount wheels</strike>
*<strike>Paint all parts</strike>
*<strike>Wheel spacers</strike>


= Drivetrain Subteam's Engineering Notebook  =
= Drivetrain Subteam's Engineering Notebook  =

Revision as of 08:25, 3 February 2010

Resources

Chassis Wheel Overhang Calculations:

Chassis Ball Overhang Calculations:

Bill of Materials


Drawing Veiws Draft. Not all parts accounted for.

File:DriveTrainDimensionsDraft.pdf


Drivetrain Master Task List

  • NEED :
  • Check wheel fit. Larry would like the keys to fit tighter.
  • Need Bumper mounting regime
  • Need bumper mounts designed
  • Need red Bumpers built (SEE CYNETTE)
  • Need bumper covers (blue)


*Work with Mech team to integrate beater bar. Front must remain stiff after c-channel is removed


COMPILE Bill of Materials

* Drive Train Parts To Be Ordered


  •   Ball Gaurd (6)                            [ORDERED 1/26]  May be available Sat.
  •  Wheel Gaurd Bearing Block (6)   [ORDERED 1/26] Josh will bring parts is Saturday AM
  •  Front Motor Gaurd (2)                 [ORDERED 1/26] Josh will bring parts is Saturday AM
  •  Rear Motor Gaurd (1)                  [ORDERED 1/26] Josh will bring parts is Saturday AM
  • Gaurd springs (6)                        
  •  chassis brace .125THK (6)         [ORDERED 1/26] Josh will bring parts is Saturday AM
  • Motor Mounts (4)                       [ORDERED 1/26] Josh will bring parts is Saturday AM
  • Guards Mount (2)                       [ORDERED 1/26] may be available Sat.
  • Build Bumpers
  • Bumber mounts
  • Build gear boxxes
  • Build wheels
  • mount wheels
  • Paint all parts
  • Wheel spacers

Drivetrain Subteam's Engineering Notebook


Week 1
2010:Drivetrain 01.11
2010:Drivetrain 01.12
2010:Drivetrain 01.13
2010:Drivetrain 01.14 Prototype drivetrain pictures, updates
2010:Drivetrain 01.16
2010:Drivetrain 01.17

Week 2
2010:Drivetrain 01.19
2010:Drivetrain 01.20
2010:Drivetrain 01.21
2010:Drivetrain 01.23
2010:Drivetrain 01.24  Updated Critical Dmensions, Pictures, Parts, tasks

Week 3
2010:Drivetrain 01.26                                
2010:Drivetrain 01.27 Weight EST. Added File:2010 Drivetrain weight est.xls
2010:Drivetrain 01.28
2010:Drivetrain 01.30
2010:Drivetrain 01.31
Week 4
2010:Drivetrain 02.02
2010:Drivetrain 02.03
2010:Drivetrain 02.04
2010:Drivetrain 02.06
2010:Drivetrain 02.07

Week 5
2010:Drivetrain 02.09
2010:Drivetrain 02.10
2010:Drivetrain 02.11
2010:Drivetrain 02.13
2010:Drivetrain 02.14

Week 6
2010:Drivetrain 02.16
2010:Drivetrain 02.17
2010:Drivetrain 02.18
2010:Drivetrain 02.19
2010:Drivetrain 02.20
Engineering Notebook Templates Available at:Engineering_Notebook_Template

Please Label All Notebook Pages 2010:Drivetrain XX.XX to avoid confusion.

Archives