2010:Drivetrain 01.13: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 7: Line 7:
3. Tasks accomplished  
3. Tasks accomplished  


*Updated BOM
*Updated BOM  
*Parts ordered:
*Parts ordered:


#Motor mounts
#Motor mounts  
#Chassis brackets
#Chassis brackets  
#Bearing blocks
#Bearing blocks  
#Cross brace
#Cross brace  
#Wheels, traction, 8 inch (2)
#Gearbox (12:1)
#Hubs
#Encoders


4. Tasks in process


*Drivetrain details
*Custom wheel design


4. Tasks in process
5. Tasks to complete tomorrow


5. Tasks to complete tomorrow
*Order key stock (0.125 keyway)
*Fasteners: determine BOM and order


6. Names of people attending tomorrow Tresten.R Lizzy.M Matt.M Gaeme.B Ben.S<br>  
6. Names of people attending tomorrow Tresten.R Lizzy.M Matt.M Gaeme.B Ben.S<br>  
Line 25: Line 33:
7. Materials are needed to work  
7. Materials are needed to work  


8. Any Images (Inventor, Scanned Sketches, Photos, Etc) Pertinent to the day's work!<br>In addition, you can do any details or lessons learned from your tasks done that day. Feel free to attach any photos, details, spreadsheets, CAD screenshots or drawings.
*Build bumpers
*Assemble motor/mount/encoder/gearbox
*Install bearings and bearing blocks
*Design bumper mounts
*Design wheel protectors
*Investigate more elegant motor/transmission/gearbox/bearing block/encoder mount
 
<br>


<br><br>
<br><br>

Revision as of 17:29, 13 January 2010

At a Minimum EACH Engineering Notebook Entry should include the following:

1. Names of the people that attended  Tresten.R  Lizzy.M  Matt.M Ben.S Graeme.B  Josh.Gannon

2. DATE & Start & Stop Time 6:40

3. Tasks accomplished

  • Updated BOM
  • Parts ordered:
  1. Motor mounts
  2. Chassis brackets
  3. Bearing blocks
  4. Cross brace
  5. Wheels, traction, 8 inch (2)
  6. Gearbox (12:1)
  7. Hubs
  8. Encoders

4. Tasks in process

  • Drivetrain details
  • Custom wheel design

5. Tasks to complete tomorrow

  • Order key stock (0.125 keyway)
  • Fasteners: determine BOM and order

6. Names of people attending tomorrow Tresten.R Lizzy.M Matt.M Gaeme.B Ben.S

7. Materials are needed to work

  • Build bumpers
  • Assemble motor/mount/encoder/gearbox
  • Install bearings and bearing blocks
  • Design bumper mounts
  • Design wheel protectors
  • Investigate more elegant motor/transmission/gearbox/bearing block/encoder mount