2010:Drivetrain 01.31: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: 01.31.2010 Start time: End time: Members present: Members Attending Next Meeting: Tasks Completed: * task Tasks In Progress: * task Tasks to Complete: * task Materials Needed...)
 
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
01.31.2010
01.31.2010  


Start time:
Start time: 10:00am


End time:
<br>


Members present:
End time:  


Members Attending Next Meeting:
<br>


Tasks Completed:
Members present: Liz M., Alex R., Ben S., Matt M., Josh G.


* task
Members Attending Next Meeting:Gannon Will need to attend Tuesday<br>


Tasks In Progress:
Alex, <br>


* task
Tasks Completed:


Tasks to Complete:
*Partlial disassembly of robot for painting<br>


* task
*Spray painting fame takinglongerthan expected due to Hammercoat and cold temperatures (-4 °F this morning BRRRR!) will be dry and ready to use Tuesday &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;


Materials Needed:
*Finneshed disassembling proto DT and restocking all unecessary parts, fasteners, components &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;


* item
<br>


Do not forget to add your needed items to the Shopping List!!
***********************************


Images &amp; Additional Updates:
 
 
TASKS&nbsp;FOR&nbsp;TUESDAY 2.02.2010
 
#Assemble front and rear Motor/skid plate/Motor mount DO&nbsp;NOT&nbsp;ASSEMBLE&nbsp;WHEELS YET
#Mount Assemblies to chassis per published dimensions
#Lastly mount wheels in the most space adventagous way.
 
**********************************
 
 
 
PARTS&nbsp;STILL&nbsp;NEEDED
<blockquote>
#Side Ball Gaurds
#Rear ball gaurd
#Side wheel gaurd mounts may need to be redesigned tyo accomadate "beater bar assembly"
#All bumber tasks
</blockquote>
*********************************
 
<br>
 
Tasks In Progress:
 
*Waiting for paint to dry
 
*Documentation updates
 
*Tasks to Complete:
 
*Reassemble robot after paint dries
 
Materials Needed:
 
*item
 
Do not forget to add your needed items to the Shopping List!!
 
Images &amp; Additional Updates:  


(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) <br>
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) <br>

Latest revision as of 15:46, 31 January 2010

01.31.2010

Start time: 10:00am


End time:


Members present: Liz M., Alex R., Ben S., Matt M., Josh G.

Members Attending Next Meeting:Gannon Will need to attend Tuesday

Alex,

Tasks Completed:

  • Partlial disassembly of robot for painting
  • Spray painting fame takinglongerthan expected due to Hammercoat and cold temperatures (-4 °F this morning BRRRR!) will be dry and ready to use Tuesday      
  • Finneshed disassembling proto DT and restocking all unecessary parts, fasteners, components               



TASKS FOR TUESDAY 2.02.2010

  1. Assemble front and rear Motor/skid plate/Motor mount DO NOT ASSEMBLE WHEELS YET
  2. Mount Assemblies to chassis per published dimensions
  3. Lastly mount wheels in the most space adventagous way.


PARTS STILL NEEDED

  1. Side Ball Gaurds
  2. Rear ball gaurd
  3. Side wheel gaurd mounts may need to be redesigned tyo accomadate "beater bar assembly"
  4. All bumber tasks


Tasks In Progress:

  • Waiting for paint to dry
  • Documentation updates
  • Tasks to Complete:
  • Reassemble robot after paint dries

Materials Needed:

  • item

Do not forget to add your needed items to the Shopping List!!

Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)