2010:Drivetrain 01.31: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: 01.31.2010 Start time: End time: Members present: Members Attending Next Meeting: Tasks Completed: * task Tasks In Progress: * task Tasks to Complete: * task Materials Needed...)
 
No edit summary
Line 1: Line 1:
01.31.2010
01.31.2010  


Start time:
Start time: 10:00am


End time:


Members present:


Members Attending Next Meeting:
End time:  


Tasks Completed:


* task


Tasks In Progress:
Members present: Liz M., Alex R., Ben S., Matt M., Josh G.


* task
Members Attending Next Meeting:


Tasks to Complete:


* task


Materials Needed:
Tasks Completed:  


* item
-Partlial disassembly of robot for painting<br>


Do not forget to add your needed items to the Shopping List!!
-Spray painting fame &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;


Images &amp; Additional Updates:
 
 
Tasks In Progress:
 
-Waiting for paint to dry
 
-Documentation updates
 
 
 
Tasks to Complete:
 
-Reassemble robot after pait dries
 
Materials Needed:
 
*item
 
Do not forget to add your needed items to the Shopping List!!
 
Images &amp; Additional Updates:  


(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) <br>
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) <br>

Revision as of 12:32, 31 January 2010

01.31.2010

Start time: 10:00am


End time:


Members present: Liz M., Alex R., Ben S., Matt M., Josh G.

Members Attending Next Meeting:


Tasks Completed:

-Partlial disassembly of robot for painting

-Spray painting fame                        


Tasks In Progress:

-Waiting for paint to dry

-Documentation updates


Tasks to Complete:

-Reassemble robot after pait dries

Materials Needed:

  • item

Do not forget to add your needed items to the Shopping List!!

Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)