2010:Drivetrain 02.07: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
Line 1: Line 1:
02.07.2010  
02.07.2010  


Start time:10:30
Start time:10:30  


End time:
End time:  


Members present: Lizzy Matt M Ben S Alex R  
Members present: Lizzy Matt M Ben S Alex R  
Line 24: Line 24:
<br>Materials Needed:  
<br>Materials Needed:  


*item<br> * item
*none


Do not forget to add your needed items to the Shopping List!!  
Do not forget to add your needed items to the Shopping List!!  

Latest revision as of 14:02, 7 February 2010

02.07.2010

Start time:10:30

End time:

Members present: Lizzy Matt M Ben S Alex R

Members Attending Next Meeting:

Tasks Completed:

  • Adjusted motor mounts - squared up frame, added spacers
  • Painted ball guard tube and wheel guard


Tasks In Progress:

  • Prep-work for assembly - waiting for wheel guards to dry


Tasks to Complete:

  • Assemble chassis with wheel guard


Materials Needed:

  • none

Do not forget to add your needed items to the Shopping List!!

Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)

Test Engineering Notebook Template