2010:FieldCrate 01:31: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
FieldCrate (talk | contribs) (New page: 1.31.2010 Start time: 11:00 End time: 7:00<br> Members present: Jason, Theo<br> Members Attending Next Meeting: Not sure<br> Tasks Completed: *Assembled Reamining Goals<br> *Cut Ba...) |
FieldCrate (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
1.31.2010 | 1.31.2010 | ||
Start time: 11:00 | Start time: 11:00 | ||
End time: 7:00<br> | End time: 7:00<br> | ||
Line 9: | Line 9: | ||
Members Attending Next Meeting: Not sure<br> | Members Attending Next Meeting: Not sure<br> | ||
<br> | |||
Tasks Completed: | |||
*Assembled Remaining Goals<br> | |||
*Assembled | |||
*Cut Ball Return Pipes | *Cut Ball Return Pipes | ||
<br>Tasks In Progress: | <br>Tasks In Progress: | ||
*Assemble Ball Returns | *Assemble Ball Returns | ||
*Carpet the Bumps and Goal Ramps | *Carpet the Bumps and Goal Ramps | ||
*Mount the Remaining Foam | *Mount the Remaining Foam | ||
Line 26: | Line 26: | ||
*Determine the connections of bumps and other items to the over all field | *Determine the connections of bumps and other items to the over all field | ||
<br>Materials Needed: | <br>Materials Needed: | ||
*Velcro (to be ordered Tuesday) | *Velcro (to be ordered Tuesday) | ||
<br> | |||
Do not forget to add your needed items to the Shopping List!! | |||
Images & Additional Updates: | |||
Images & Additional Updates: | |||
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) | (Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) | ||
Test Engineering Notebook Template <br> | Test Engineering Notebook Template <br> |
Latest revision as of 07:19, 2 February 2010
1.31.2010
Start time: 11:00
End time: 7:00
Members present: Jason, Theo
Members Attending Next Meeting: Not sure
Tasks Completed:
- Assembled Remaining Goals
- Cut Ball Return Pipes
Tasks In Progress:
- Assemble Ball Returns
- Carpet the Bumps and Goal Ramps
- Mount the Remaining Foam
Tasks to Complete:
- Determine the connections of bumps and other items to the over all field
Materials Needed:
- Velcro (to be ordered Tuesday)
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
Test Engineering Notebook Template