2010:Mechanical: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
(crossed off completed items)
Line 1: Line 1:
= Master Task List  =
= Master Task List  =


#Design Motor Mounts...Done  
#<strike>Design Motor Mounts...Done</strike>
#Design Bearing Mounts ...Done  
#<strike>Design Bearing Mounts ...Done</strike>
#Help Drivetrain with ProE Import  
#<strike>Help Drivetrain with ProE Import</strike>
#Have other teams review Trap Doors - Integration  
#<strike>Have other teams review Trap Doors - Integration</strike>
#Keep Track of Weight Distribution - Integration  
#Keep Track of Weight Distribution - Integration  
#Complete Bill of Materials  
#Complete Bill of Materials  
Line 10: Line 10:
#Determine if front wheels are needed  
#Determine if front wheels are needed  
#Choose &amp;&nbsp;Order Materials/Parts  
#Choose &amp;&nbsp;Order Materials/Parts  
#Create Model Shop Drawings...Week 3 main focus<br>
#Create Model Shop Drawings...Week 3 main focus
#Add all belts &amp;&nbsp;pulleys to design  
#Add all belts &amp;&nbsp;pulleys to design  
#Define Roller/Chicken Plucker designs ...Done  
#<strike>Define Roller/Chicken Plucker designs ...Done</strike>
#Complete Trap Door designs in Inventor ...Done  
#<strike>Complete Trap Door designs in Inventor ...Done</strike>
#Define outside material for robot  
#Define outside material for robot  
#Design Sensor Mounts  
#Design Sensor Mounts  
#Design Battery Box &amp;&nbsp;CRio Mount (Electrical needs help)...Started  
#Design Battery Box &amp;&nbsp;CRio Mount (Electrical needs help)...Started  
#Mock up Weight on the Chassis so programming/Drivers can use&nbsp; ...Done  
#<strike>Mock up Weight on the Chassis so programming/Drivers can use&nbsp; ...Done</strike>
#Design seperator
#Design seperator


<br>  
<br>


= Resources  =
= Resources  =

Revision as of 12:14, 4 February 2009

Master Task List

  1. Design Motor Mounts...Done
  2. Design Bearing Mounts ...Done
  3. Help Drivetrain with ProE Import
  4. Have other teams review Trap Doors - Integration
  5. Keep Track of Weight Distribution - Integration
  6. Complete Bill of Materials
  7. Assign Surfaces for Control System Mounting
  8. Determine if front wheels are needed
  9. Choose & Order Materials/Parts
  10. Create Model Shop Drawings...Week 3 main focus
  11. Add all belts & pulleys to design
  12. Define Roller/Chicken Plucker designs ...Done
  13. Complete Trap Door designs in Inventor ...Done
  14. Define outside material for robot
  15. Design Sensor Mounts
  16. Design Battery Box & CRio Mount (Electrical needs help)...Started
  17. Mock up Weight on the Chassis so programming/Drivers can use  ...Done
  18. Design seperator


Resources

The 2009 Kit of Parts are designed in Autodesk Inventor Professional and available through the Autodesk FIRSTbase website.


This is the Mechanical Subteam 1's Engineering Notebook

Week 1 - 42 Days Left!!

Mechanical 1 - 1.6.09

Mechanical 1 - 1.7.09

Mechanical 1 - 1.8.09

Mechanical 1 - 1.10.09

Mechanical 1 - 1.11.09

Week 2 -35 Days Left!!

Mechanical 1 - 1.13.09

Mechanical 1 - 1.14.09

Mechanical 1 - 1.15.09

Mechanical 1 - 1.17.09

Mechanical 1 - 1.18.09

Week 3 - 28 Days Left!!

Mechanical 1 - 1.20.09

Mechanical 1 - 1.21.09

Mechanical 1 - 1.22.09

Mechanical 1 - 1.24.09

Mechanical 1 - 1.25.09

Week 4 - 21 Days Left!!

Mechanical 1.27.2009

Mechanical 1.28.2009

Mechanical 1.29.2009

Mechanical 1.31.2009

Mechanical 2.1.2009


Please Label All Notebook Pages Mechanical 1 X.XX.2009 to avoid confusion.