2010:Mechanical

From 1511Wookiee
Revision as of 15:34, 27 January 2009 by Mechanical1 (talk | contribs)
Jump to navigationJump to search

Master Task List

  1. Design Motor Mounts...Done
  2. Design Bearing Mounts ...Done
  3. Help Drivetrain with ProE Import
  4. Have other teams review Trap Doors - Integration
  5. Keep Track of Weight Distribution - Integration
  6. Complete Bill of Materials
  7. Assign Surfaces for Control System Mounting
  8. Determine if front wheels are needed
  9. Choose & Order Materials/Parts
  10. Create Model Shop Drawings...Week 3 main focus
  11. Add all belts & pulleys to design
  12. Define Roller/Chicken Plucker designs ...Done
  13. Complete Trap Door designs in Inventor ...Done
  14. Define outside material for robot
  15. Design Sensor Mounts
  16. Design Battery Box & CRio Mount (Electrical needs help)...Started
  17. Mock up Weight on the Chassis so programming/Drivers can use  ...Done
  18. Design seperator


Resources

The 2009 Kit of Parts are designed in Autodesk Inventor Professional and available through the Autodesk FIRSTbase website.


This is the Mechanical Subteam 1's Engineering Notebook

Week 1 - 42 Days Left!!

Mechanical 1 - 1.6.09

Mechanical 1 - 1.7.09

Mechanical 1 - 1.8.09

Mechanical 1 - 1.10.09

Mechanical 1 - 1.11.09

Week 2 -35 Days Left!!

Mechanical 1 - 1.13.09

Mechanical 1 - 1.14.09

Mechanical 1 - 1.15.09

Mechanical 1 - 1.17.09

Mechanical 1 - 1.18.09

Week 3 - 28 Days Left!!

Mechanical 1 - 1.20.09

Mechanical 1 - 1.21.09

Mechanical 1 - 1.22.09

Mechanical 1 - 1.24.09

Mechanical 1 - 1.25.09

Week 4 - 21 Days Left!!

Mechanical 1.27.2009

Mechanical 1.28.2009

Mechanical 1.29.2009

Mechanical 1.31.2009

Mechanical 2.1.2009


Please Label All Notebook Pages Mechanical 1 X.XX.2009 to avoid confusion.