2011:Drivetrain 1.23

From 1511Wookiee
Revision as of 10:11, 23 January 2011 by Mechanical2 (talk | contribs)
Jump to navigationJump to search

Attendance

Start time:

End time:

Members present: Mo, Matt

Members Attending Next Meeting:

Tasks Completed

  • complete :Assemble 4 omni wheels and hubs and sprockets
    Check to make sure we have epoxy or Gorilla glue.
    task
    • sub-task
    • sub-task
  • task

Tasks to Complete

  • Assemble traction wheels with hubs and sprockets 
  • For traction wheels, method is rivet one end first, do trial fit, stretch, roll around, a couple of times. Get length cut.
    glue, and wrap tread, drill the two remaining rivet holes. Make sure tread is seated all around.
    Determine where to mount bumpers either through frame rail channels or make brackets?
    Need to buy bolts for bumpers, if we go through frame rail it will be 3/8" -16 x 2.5Tasks In Progress
    sub-task
  • task

Materials Needed

  • task
    • sub-task
    • sub-task
  • task