2011:Drivetrain 1.27: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
(New page: = Attendance = '''Start time: ''' '''End time: ''' '''Members present: ''' '''Members Attending Next Meeting: ''' = Tasks Completed = *task **sub-task **sub-task *task = Tasks In Pr...) |
Drivetrain (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
= Attendance = | = Attendance = | ||
'''Start time: ''' | '''Start time:6pm''' | ||
'''End time: ''' | '''End time:10pm''' | ||
'''Members present: ''' | '''Members present:Mr.Cavaliere, Liz M., Mo, Matt M., Jonathan G.''' | ||
'''Members Attending Next Meeting: ''' | '''Members Attending Next Meeting: ''' | ||
= Tasks Completed = | = Tasks Completed = | ||
* | *drivetrain is finished minus a few tweaks<br> | ||
= Tasks In Progress = | = Tasks In Progress = | ||
* | *fix spacer on back left omni wheel<br> | ||
* | *put on stableizer bar over moters <br> | ||
* | *losen tensioner on right side<br> | ||
* | *fix tensioner on left side<br> | ||
= Tasks to Complete = | = Tasks to Complete = | ||
* | *same as tasks in progress | ||
= Materials Needed = | = Materials Needed = | ||
* | *space bar | ||
* | *copper pipeing and cutter | ||
*phillips head screwdriver | |||
* |
Latest revision as of 20:11, 27 January 2011
Attendance
Start time:6pm
End time:10pm
Members present:Mr.Cavaliere, Liz M., Mo, Matt M., Jonathan G.
Members Attending Next Meeting:
Tasks Completed
- drivetrain is finished minus a few tweaks
Tasks In Progress
- fix spacer on back left omni wheel
- put on stableizer bar over moters
- losen tensioner on right side
- fix tensioner on left side
Tasks to Complete
- same as tasks in progress
Materials Needed
- space bar
- copper pipeing and cutter
- phillips head screwdriver