2011:Electrical Controls: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 3: Line 3:
= Goals  =
= Goals  =


Create sheet metal designs and send in by MONDAY (1/24)
* Install LED lights on our buttons
* Finalize the paper version of our controls
**Transfer the paper controls into a proto-type model
*Decide on additional toggles, switches & buttons
*Locate running wire holes<br>


= Important Links  =
= Important Links  =

Revision as of 16:56, 26 January 2011

Electrical Controls Subteam's Engineering Notebook

Goals

  •  Install LED lights on our buttons
  •  Finalize the paper version of our controls
    • Transfer the paper controls into a proto-type model
  • Decide on additional toggles, switches & buttons
  • Locate running wire holes

Important Links

Task List

Shopping List

Mentor Availablility

File:Controls mechanical.xls

Status Reports

Week 1

Week 2

Week 3

Week 4

Week 5

Week 6

Engineering Notebook Templates Available at:Engineering_Notebook_Template

Please Label All Notebook Pages 2011:Controls XX.XX to avoid confusion.


Useful Links

Design Files

Defined Control Functions

Control Assignment

Design Criteria

Brainstorming Ideas

Part Measurements

Cypress IO Board Design Files

Archives

2010 Electrical Controls Main Page

2009 Electrical Controls Main Page