2011:Electrical Main 1.27: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 16: | Line 16: | ||
*Finished boared control panel on Inventor | *Finished boared control panel on Inventor | ||
= Tasks In Progress = | = Tasks In Progress = | ||
* | *Desining battery box on Inventor | ||
* | * Updating IO map | ||
*Deside on electrical board material based on weight and strength | |||
* | |||
= Tasks to Complete = | = Tasks to Complete = |
Revision as of 19:15, 27 January 2011
Attendance
Start time: 6:00
End time: 9:30
Members present: Alex R, Vaghn T, Matthieu D, Dave S, Dave B
Members Attending Next Meeting: Alex R, Vaughn T, Dave B, Dave S
Tasks Completed
- Finished Banner sensor
- Followed app note to figure out why the amperage was wrong
- Voltage went from 2.7 when not covered, to 5 when covered
- Finished boared control panel on Inventor
Tasks In Progress
- Desining battery box on Inventor
- Updating IO map
- Deside on electrical board material based on weight and strength
Tasks to Complete
- task
- sub-task
- sub-task
- task
Materials Needed
- task
- sub-task
- sub-task
- task