2011:Electrical Main 1.30

From 1511Wookiee
Revision as of 14:53, 30 January 2011 by Drivetrain (talk | contribs)
Jump to navigationJump to search

Attendance

Start time: 10:00 AM

End time: 4:45PM

Members present: Dave B, Dave S, Alex R, Vaughn, Matthieu

Members Attending Next Meeting: See list

Tasks Completed

  • Connected the line following sensors
  • Connected teh drive motor encoders
  • Broke and then fixed the minibot motors

Tasks In Progress

  • Battery testing

Tasks to Complete

  • Remake the Can Bus to R232 Cable
  • Add another Jaguar to the mock board for the arm motor

Materials Needed

  • Minibot motor (on order)
    • Minibot motor power connector (on order)