2011:Field 1/16/2011: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: Members present: <br>Members Attending Next Meeting: -------------------------------------------------------------------------------- Tasks Completed: Task 1 - Task 2 - ---...)
 
No edit summary
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
Members present:  
Members present: Jason, Manuel
 
Mentors: Amy, Lloyd


<br>Members Attending Next Meeting:  
<br>Members Attending Next Meeting:  


<br>


<br>


 
----
 
--------------------------------------------------------------------------------


Tasks Completed:  
Tasks Completed:  


Task 1 -  
Task 1 - 1 section of wall with grid.


Task 2 -
Task 2 -  


<br>


 
----
--------------------------------------------------------------------------------  


Tasks In Progress:  
Tasks In Progress:  


Task 1 -  
Task 1 - Player station wall construction.


Task 2 -  
Task 2 -  
Line 29: Line 31:
Tasks to Complete:  
Tasks to Complete:  


Task 1 -  
Task 1 - Assemble 3 more tower assemblies.<br>


Task 2 -  
Task 2 - Cut and assemble 4 stop plates for tower assemblies.
 
Task 3 - Screw plates to pegs.


Task 4 - Determine reflective tape part number and who we can buy it from. <br>Task 5 - Cut pieces for player stations.


----


Materials Needed:


<br>Item 1 - Field tape.


--------------------------------------------------------------------------------
Item 2 - Game pieces.


Materials Needed:
Item 3 - Additional PVC.


<br>Item 1 -  
Item 4 - Reflective Tape.


Item 2 -
Item 5 - Hardware for player station walls, velcro.


--------------------------------------------------------------------------------  
----


Images &amp; Additional Updates:  
Images &amp; Additional Updates:  


(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)

Latest revision as of 05:57, 17 January 2011

Members present: Jason, Manuel

Mentors: Amy, Lloyd


Members Attending Next Meeting:




Tasks Completed:

Task 1 - 1 section of wall with grid.

Task 2 -



Tasks In Progress:

Task 1 - Player station wall construction.

Task 2 -


--------------------------------------------------------------------------------

Tasks to Complete:

Task 1 - Assemble 3 more tower assemblies.

Task 2 - Cut and assemble 4 stop plates for tower assemblies.

Task 3 - Screw plates to pegs.

Task 4 - Determine reflective tape part number and who we can buy it from.
Task 5 - Cut pieces for player stations.


Materials Needed:


Item 1 - Field tape.

Item 2 - Game pieces.

Item 3 - Additional PVC.

Item 4 - Reflective Tape.

Item 5 - Hardware for player station walls, velcro.


Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)