2011:Field 1/19/2011: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
 
Line 1: Line 1:
Members present:  
Members present: Jason, Manuel
 
Mentors present: Amy


<br>Members Attending Next Meeting:  
<br>Members Attending Next Meeting:  
Line 7: Line 9:




--------------------------------------------------------------------------------
 
 
<br>--------------------------------------------------------------------------------


Tasks Completed:  
Tasks Completed:  


Task 1 -  
Task 1 - Pipes for grids cut and assembled.


Task 2 -
Task 2 -  






--------------------------------------------------------------------------------  
 
 
--------------------------------------------------------------------------------


Tasks In Progress:  
Tasks In Progress:  


Task 1 -  
Task 1 - Assemble 3 more tower assemblies.
 
Task 2 - Interference fit the end plates onto pegs.<br>--------------------------------------------------------------------------------
 
Tasks to Complete:


Task 2 -  
Task 1 - Assemble 4 stop plates for tower assemblies.
 
Task&nbsp;2 - Determine reflective tape part number and who we can buy it from. <br>Task 3- Cut pieces for player stations table.
 
Task&nbsp;4 - Paint player station walls.


<br>--------------------------------------------------------------------------------  
Task&nbsp;5 - Paint field elements.


Tasks to Complete:
Task 6 - Cut 2x4s for player station walls.


Task 1 -


Task 2 -




Line 37: Line 49:




--------------------------------------------------------------------------------  
<br>--------------------------------------------------------------------------------


Materials Needed:  
Materials Needed:  


<br>Item 1 -  
<br>Item 1 - Field tape.
 
Item 2 - Game pieces.&nbsp;
 
Item&nbsp;3 - Reflective Tape.


Item 2 -
Item&nbsp;4 - Hardware for player station walls, velcro.


--------------------------------------------------------------------------------


Images &amp; Additional Updates:


(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
<br>

Latest revision as of 06:27, 20 January 2011

Members present: Jason, Manuel

Mentors present: Amy


Members Attending Next Meeting:





--------------------------------------------------------------------------------

Tasks Completed:

Task 1 - Pipes for grids cut and assembled.

Task 2 -




Tasks In Progress:

Task 1 - Assemble 3 more tower assemblies.

Task 2 - Interference fit the end plates onto pegs.
--------------------------------------------------------------------------------

Tasks to Complete:

Task 1 - Assemble 4 stop plates for tower assemblies.

Task 2 - Determine reflective tape part number and who we can buy it from.
Task 3- Cut pieces for player stations table.

Task 4 - Paint player station walls.

Task 5 - Paint field elements.

Task 6 - Cut 2x4s for player station walls.





--------------------------------------------------------------------------------

Materials Needed:


Item 1 - Field tape.

Item 2 - Game pieces. 

Item 3 - Reflective Tape.

Item 4 - Hardware for player station walls, velcro.