2011:Field 1/20/2011: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
Members present: Jason, Manuel, Kieran, Shayna 
Members present: Jason, Manuel, Kieran, Shayna   


Mentors present: Amy, Lloyd 
Mentors present: Amy, Lloyd   


<br>Members Attending Next Meeting:  
<br>Members Attending Next Meeting:  


<br>


<br>


<br>


<br>


<br>


 
----
 
 
 
 
--------------------------------------------------------------------------------  


Tasks Completed:  
Tasks Completed:  
Line 21: Line 21:
Task 1 - Interference fit the end plates onto pegs.<br>Task 2 - Cut 2x4s for player station walls. <br>Task 3 - Assemble 4 stop plates for tower assemblies. <br>
Task 1 - Interference fit the end plates onto pegs.<br>Task 2 - Cut 2x4s for player station walls. <br>Task 3 - Assemble 4 stop plates for tower assemblies. <br>


 
<br>--------------------------------------------------------------------------------  
 
 
 
 
 
<br>--------------------------------------------------------------------------------


Tasks In Progress:  
Tasks In Progress:  
Line 35: Line 29:
Task 2 -  
Task 2 -  


--------------------------------------------------------------------------------  
----


Tasks to Complete:  
Tasks to Complete:  


Task 1 - Assemble 4 stop plates to poles.
Task 1 - Assemble 4 stop plates to poles.  


Task 2 - Determine reflective tape part number and who we can buy it from. <br>Task 3- Cut pieces for player stations table.  
Task 2 - Determine reflective tape part number and who we can buy it from. <br>Task 3- Cut pieces for player stations table.  
Line 47: Line 41:
Task 5 - Paint field elements.  
Task 5 - Paint field elements.  


 
----
 
 
 
 
 
 
 
 
 
--------------------------------------------------------------------------------  


Materials Needed:  
Materials Needed:  
Line 69: Line 53:
Item 4 - Hardware for player station walls, velcro.  
Item 4 - Hardware for player station walls, velcro.  


<br>


----
----


 
<br>Images &amp; Additional Updates:  
Images &amp; Additional Updates:  


(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)

Revision as of 05:39, 21 January 2011

Members present: Jason, Manuel, Kieran, Shayna 

Mentors present: Amy, Lloyd 


Members Attending Next Meeting:







Tasks Completed:

Task 1 - Interference fit the end plates onto pegs.
Task 2 - Cut 2x4s for player station walls.
Task 3 - Assemble 4 stop plates for tower assemblies.


--------------------------------------------------------------------------------

Tasks In Progress:

Task 1 - Assemble 3 more tower assemblies.

Task 2 -


Tasks to Complete:

Task 1 - Assemble 4 stop plates to poles.

Task 2 - Determine reflective tape part number and who we can buy it from.
Task 3- Cut pieces for player stations table.

Task 4 - Paint player station walls.

Task 5 - Paint field elements.


Materials Needed:


Item 1 - Field tape.

Item 2 - Game pieces.

Item 3 - Reflective Tape.

Item 4 - Hardware for player station walls, velcro.




Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)