2011:Mechanical 1 1.26: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
Line 54: Line 54:
= Tasks to Complete  =
= Tasks to Complete  =


*Putting Inventor files on the wiki-page<br>
*Building some of the extra parts we need


= Materials Needed  =
= Materials Needed  =


*Paper, aluminum (already aquired)<br>
*Paper, aluminum (already aquired)<br>

Latest revision as of 16:47, 27 January 2011

Attendance

Start time: 6:00

End time: 9:00

Members present:

Austin Lee

Alex Vadas

Elizabeth Mchesney

Gabe Rosenburg

Kyle Schuhart

Tom Murphy

Members Attending Next Meeting:

All

Tasks Completed

  • Finished building Inventor Mini-bot (expect Pictures soon)
  • Finished applying Tusks to Robot
  • Determined between the two mech teams that the interface between the deployer and mounting it on the robot will be handled by the Mechanical Arm Team
  • Has achieved weight goal of 10-12 lbs.
  • Minibot Bottom Iso Open.jpgMinibot Bottom Open.jpgMinibot Rear Iso Closed.jpgClosed Front View update.jpgBase Closed View update.jpgMinibot Rear Iso Open.jpgMinibot Top Closed.jpgMinibot Top Open.jpg

Tasks In Progress

  • Getting Acurate IDW's so we can build parts we need
  • Uploading pictures
  • Deployer Model is 90% complete
  • Looked over with other mech team 



Deployer Iso Top Ext.jpgDeployer Iso Top Retract.jpg

Deployer Side Retract.jpg


Deployer Top Retract.jpg

Deployer Top View Ext.jpg

Tasks to Complete

  • Building some of the extra parts we need

Materials Needed

  • Paper, aluminum (already aquired)