2011:Mechanical 1 1.26: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Drivetrain (talk | contribs) No edit summary |
Drivetrain (talk | contribs) No edit summary |
||
Line 31: | Line 31: | ||
*Getting Acurate IDW's so we can build parts we need | *Getting Acurate IDW's so we can build parts we need | ||
*Uploading pictures<br> | *Uploading pictures<br> | ||
*Deployer Model is 90% complete | |||
*Looked over with other mech team | |||
= Tasks to Complete = | = Tasks to Complete = |
Revision as of 12:13, 27 January 2011
Attendance
Start time: 6:00
End time: 9:00
Members present:
Austin Lee
Alex Vadas
Elizabeth Mchesney
Gabe Rosenburg
Kyle Schuhart
Tom Murphy
Members Attending Next Meeting:
All
Tasks Completed
- Finished building Inventor Mini-bot (expect Pictures soon)
- Finished applying Tusks to Robot
Tasks In Progress
- Getting Acurate IDW's so we can build parts we need
- Uploading pictures
- Deployer Model is 90% complete
- Looked over with other mech team
Tasks to Complete
- Putting Inventor files on the wiki-page
Materials Needed
- Paper, aluminum (already aquired)