2012:Drivetrain 01.15: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 22: Line 22:
= Tasks In Progress  =
= Tasks In Progress  =


* Chassis work
* Chassis work  
* E- channels/braces 
* E- channels fabrication    
*wheel spacings
*wheel spacings
* 


= Tasks to Complete  =
= Tasks to Complete  =

Revision as of 18:36, 15 January 2012

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks Completed

  • inventor drawings worked on.  
  •  E(pic)-Bracket drawings/design finished
  • wiki updated
  • Plastic plug design for E-Bracket ends completed.
  • updated chassis drawings
  • preliminary placement info for electrical board completed.
  • prototype Electrical board made and tested.

Tasks In Progress

  •  Chassis work
  •  E- channels fabrication  
  • wheel spacings

Tasks to Complete

  • E(pic)-Bracket completion and manufacturing.
  • FINALIZE BALL DEFLECTOR

Materials Needed

  • PROTRACTORS!!!