2012:Drivetrain 01.15: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
Line 29: Line 29:
= Tasks to Complete  =
= Tasks to Complete  =


*E(pic)-Bracket completion and manufacturing.  
*E(pic)-Bracket completion and Fabrication.
*FINALIZE BALL DEFLECTOR
*FINALIZE BALL DEFLECTOR



Latest revision as of 18:37, 15 January 2012

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks Completed

  • inventor drawings worked on.  
  •  E(pic)-Bracket drawings/design finished
  • wiki updated
  • Plastic plug design for E-Bracket ends completed.
  • updated chassis drawings
  • preliminary placement info for electrical board completed.
  • prototype Electrical board made and tested.
  • started fabrication of E-Brackets

Tasks In Progress

  •  Chassis work
  •  E- channels fabrication  
  • wheel spacings

Tasks to Complete

  • E(pic)-Bracket completion and Fabrication.
  • FINALIZE BALL DEFLECTOR

Materials Needed

  • PROTRACTORS!!!