2012:Drivetrain 01.15

From 1511Wookiee
Revision as of 17:17, 15 January 2012 by Drivetrain (talk | contribs)
Jump to navigationJump to search

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks Completed

  • inventor drawings worked on.  
  •  E(pic)-Bracket drawings/design finished
  • wiki updated

Tasks In Progress

  •  Chassis work
  •  E- channels/braces 
  • wheel spacings
  •  

Tasks to Complete

  • E(pic)-Bracket completion and manufacturing.
  • FINALIZE BALL DEFLECTOR

Materials Needed

  • PROTRACTORS!!!