= To Do = | |||
#Finish primary chassis | |||
##Paint | |||
##Instal Wheels | |||
##Instal transmitions | |||
##Add chains | |||
##Add Circuit Plank | |||
##Wire It up | |||
##Add code | |||
##Mock up drive station | |||
#Finish CAD model | |||
#Finish Secondary chassis | |||
##Finish L brackets | |||
##Assemble | |||
##Add Wheels | |||
##Add Transmitions | |||
##Add chains | |||
##Add<font size="3"> </font><span style="font-size: small;">Circuit Plank</span> | |||
##Wire It up | |||
##Download Code | |||
##Fake Driver Station | |||
= Goals = | = Goals = | ||
*Make substantial progress on the CAD model(s) of the robot (by Tuesday 1/13 integration meeting at 6:30) | |||
*Assemble the second chassis (by Tuesday 1/13 integration meeting at 6:30) | |||
*Prepare primary chassis | |||
*Build transmissions | |||
*Finish primary drivetrain | |||
*Finish secondary drivetrain | |||
== Completed Goals == | == Completed Goals == | ||
*'''NONE''' | |||
= Drivetrain Design Specifications = | = Drivetrain Design Specifications = | ||
*27" long * 28" wide aluminum c-channel chassis | |||
== Ideas For Changes == | == Ideas For Changes == | ||
*'''NONE''' | |||
= Equipment Requirements/Size = | = Equipment Requirements/Size = | ||
-Weight | |||
*-Weight | |||
-Cim motors | ** | ||
Unknown | |||
*-Cim motors | |||
** | |||
-4 | |||
== Impact == | == Impact == | ||
*Weight remaining | |||
** | |||
Unknown | |||
*Cim motors remaining | |||
** | |||
2 | |||
= Sub-Team Mentors = | = Sub-Team Mentors = | ||
-Fill in here | -Fill in here | ||
= Student Members = | = Student Members = | ||
*Fill in names | |||
** | |||
-And sub-team (electric, mechanical, etc.) | |||
*Raymond Healy | |||
** | |||
Programming |
Revision as of 10:50, 12 January 2014
To Do
- Finish primary chassis
- Paint
- Instal Wheels
- Instal transmitions
- Add chains
- Add Circuit Plank
- Wire It up
- Add code
- Mock up drive station
- Finish CAD model
- Finish Secondary chassis
- Finish L brackets
- Assemble
- Add Wheels
- Add Transmitions
- Add chains
- Add Circuit Plank
- Wire It up
- Download Code
- Fake Driver Station
Goals
- Make substantial progress on the CAD model(s) of the robot (by Tuesday 1/13 integration meeting at 6:30)
- Assemble the second chassis (by Tuesday 1/13 integration meeting at 6:30)
- Prepare primary chassis
- Build transmissions
- Finish primary drivetrain
- Finish secondary drivetrain
Completed Goals
- NONE
Drivetrain Design Specifications
- 27" long * 28" wide aluminum c-channel chassis
Ideas For Changes
- NONE
Equipment Requirements/Size
- -Weight
Unknown
- -Cim motors
-4
Impact
- Weight remaining
Unknown
- Cim motors remaining
2
Sub-Team Mentors
-Fill in here
Student Members
- Fill in names
-And sub-team (electric, mechanical, etc.)
- Raymond Healy
Programming