2015:Gripper Subteam: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 46: Line 46:


Zach designs part wrong multiple times.
Zach designs part wrong multiple times.
[http://i.imgur.com/xOjIdqu.png Desing for arm]


'''1/11/2015'''
'''1/11/2015'''


[http://i.imgur.com/PhR4NFf.jpg G7 whiteboard]
[http://i.imgur.com/PhR4NFf.jpg G7 whiteboard]

Revision as of 18:17, 13 January 2015

Overview of Design

4 Options evaluated

Lead screw (Design Chosen)-

4 Bar linkage-

Scissor Actuator-

Single Cylinder Pneumatics w/ Cable wheel-

Work Accomplished on 1/10/2015

Task list

•clean up calcs and review w/c.s (goal speed (lifter) 1m/s)

•look at 2013- use same lifter opt 1 – scissor lift, opt 2 – 4-bar, opt3- lead screw. Opt 4 – single cyclinder w/ cable wheel

•get lifter group to understand, sude- lift mech

•divvy up components

•pick wikki student

•strategy/control- do we need 2nd grip to go up and down

•size/pick motor (27 stacks) mech cam controls force

•decide on grip design MB. # of open/close – proof pneumatics works

•answer G’ or 5?????-Larry irrelevance

•review parts/ assembly log

•steps- w/static upper


Pro/Con chart for designs Picture of 1/10/14 whiteboard in G4

STABILIZER

Calculations

2D design

Zach designs part wrong multiple times.

Desing for arm

1/11/2015

G7 whiteboard