2015:Gripper Subteam: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
(1/14/2015)
Line 52: Line 52:


[http://i.imgur.com/PhR4NFf.jpg G7 whiteboard]
[http://i.imgur.com/PhR4NFf.jpg G7 whiteboard]
'''1/14/2015'''
'''​task list'''
finalize actuator - lead screw
*finalize carriage design 
*work on gripper design - tube? - Combo? - Sheet mtl?
'''stabilizer'''
*'''spec actuator (PNV)'''
*'''mentor review of design - finalize'''

Revision as of 18:34, 14 January 2015

Overview of Design

4 Options evaluated

Lead screw (Design Chosen)-

4 Bar linkage-

Scissor Actuator-

Single Cylinder Pneumatics w/ Cable wheel-

Work Accomplished on 1/10/2015

Task list

•clean up calcs and review w/c.s (goal speed (lifter) 1m/s)

•look at 2013- use same lifter opt 1 – scissor lift, opt 2 – 4-bar, opt3- lead screw. Opt 4 – single cyclinder w/ cable wheel

•get lifter group to understand, sude- lift mech

•divvy up components

•pick wikki student

•strategy/control- do we need 2nd grip to go up and down

•size/pick motor (27 stacks) mech cam controls force

•decide on grip design MB. # of open/close – proof pneumatics works

•answer G’ or 5?????-Larry irrelevance

•review parts/ assembly log

•steps- w/static upper


Pro/Con chart for designs Picture of 1/10/14 whiteboard in G4

STABILIZER

Calculations

2D design

Zach designs part wrong multiple times.

Desing for arm

1/11/2015

G7 whiteboard

1/14/2015

​task list

finalize actuator - lead screw

  • finalize carriage design 
  • work on gripper design - tube? - Combo? - Sheet mtl?

stabilizer

  • spec actuator (PNV)
  • mentor review of design - finalize